The Keelson · Yonge–St. Clair

September 2026 edition

Property Snapshot

What is being built, applied for, and sold in Yonge–St. Clair.

Home prices

average sale price

$1,506,649

August 2026 · 39 sales

$1.0M$1.5M$2.0M$2.5MAug 25Nov 25Feb 26May 26Aug 26

12-month average: $1,726,119.

Based on 39 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, August 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, August 2026
Home typeSalesAverage price
Detached3$3,521,667
Semi-Detached7$2,012,814
Condo Apartment29$1,176,021

No sales recorded in August 2026: Att/Row/Townhouse, Condo Townhouse, Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district C02, published 2026-09-03.

Committee of Adjustment

hearings coming up

2

Updated daily · as of 11 October 2026

Decided in August 2026

1 — all refused

TapClick here to see the 2 hearings coming up

Every hearing scheduled as of 11 October 2026, in the order it will be heard. Descriptions are the City’s own words.

Wednesday 4 November

2:00 p.m. · Virtual Hearing / Committee Room 1, Second Floor, Toronto City Hall, 100 Queen St W, M5H 2N2

  • 57 Gormley Ave

    To alter the existing two-and-one-half-storey detached dwelling by constructing a new front porch with canopy, a rear two-storey addition (with a rear second storey balcony), and a rear third storey rooftop deck. A rear portion of the existing third storey will be demolished.

    File A0677/26TEY

Tuesday 10 August

TBA · TBA

  • 1 Delisle Ave · Postponed

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.

    File B0048/26TEY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-11.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

23

August 2026

TapClick here to see what the 23 permits were for
  • 619 Avenue Rd

    • Replace a 4inch DCVA for the domesic main to both buildings · Issued (Permit Issued)
  • 625 Avenue Rd

    • Replace a 4inch DCVA for the domesic main to both buildings · Issued (Permit Issued)
  • 3 Baker Ave

    • Install Backwater valve on sanitary line · Closed (Closed)
  • 5 Balmoral Ave

    • Proposal to repair detiorated roof framing at rear of home, joist replacements on second and main floor. · Issued (Permit Issued)
  • 100 Birch Ave

    • Build a new retaining wall adjacent to existing retaining wall, 2 feet away from private property line, and removal and replacement of damaged fence. · Work under way (Inspection)

Total over the last 12 months

Yonge–St. Clair
181
Average Toronto neighbourhood this size
about 198

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

0

June 2026 – August 2026

Total over the last 12 months

Yonge–St. Clair
2
Average Toronto neighbourhood this size
about 2
TapClick here to see the 14 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 25 September 2026 · Site Plan Approval · Application Received

    1560 Yonge St

    Proposed four storey community centre with a gross floor area of 6,166sqm.

    Application 26 244360 STE 12 SA

    On the City’s site →

  • 24 December 2025 · Site Plan Approval · Under Review

    135 St Clair Ave W

    Proposed 49 storey mixed-use, 544-unit residential tower containing 46,009sqm residential GFA and 920sqm non-residential GFA, with a total height of 164.3 metres.

    Application 25 269831 STE 12 SA

    On the City’s site →

  • 25 February 2025 · Site Plan Approval · Under Review

    61 Lawton Blvd, 59 Lawton Blvd, 63 Lawton Blvd and 9 more addresses

    Site Plan Approval for two new 38 and 43-storey residential buildings. The proposed development will be comprised of 706 residential units.

    Application 25 121712 STE 12 SA

    On the City’s site →

  • 25 February 2025 · OPA / Rezoning · OMB Appeal

    59 Lawton Blvd, 61 Lawton Blvd, 63 Lawton Blvd and 9 more addresses

    OLT Interim Order for Approval of two new 37 and 38-storey residential buildings subject to fulfillment of conditions.

    Application 25 121716 STE 12 OZ

    On the City’s site →

  • 7 September 2022 · Site Plan Approval · Under Review

    45 St Clair Ave W

    The proposal involves the intensification of the subject site, which is currently developed with a 14-storey office building, with a 50-storey mixed-use building with a height of 158.85 metres (166.85 metres to the top of the mechanical penthouse), comprised of a 4-storey office/retail base building and a 46-storey residential tower above. The proposed building contains a total gross floor area of approximately 49,089.18 square metres, including 42,415.39 square metres of residential GFA, 6,106.18 square metres of office GFA and 567.61 square metres of retail GFA, resulting in an overall density of 15.66 FSI. A total of 629 purpose-built rental residential dwelling units are proposed.

    Application 22 200452 STE 12 SA

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C02, which may cover a wider area than Yonge–St. Clair alone.

The September 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports