October 2026 edition
Property Snapshot
What is being built, applied for, and sold in Yonge–Bay Corridor.
Home prices
average sale price
$804,651
September 2026 · 241 sales
12-month average: $811,937.
| Month | Average sale price |
|---|---|
| Sep 2025 | $853,493 |
| Oct 2025 | $846,197 |
| Nov 2025 | $796,345 |
| Dec 2025 | $778,532 |
| Jan 2026 | $757,256 |
| Feb 2026 | $846,628 |
| Mar 2026 | $811,594 |
| Apr 2026 | $818,716 |
| May 2026 | $831,586 |
| Jun 2026 | $852,972 |
| Jul 2026 | $773,284 |
| Aug 2026 | $778,870 |
| Sep 2026 | $804,651 |
Based on 241 sales in September 2026.
TapClick to see what your type of home is selling forHide the home types
Sales and average price by major home type, September 2026 — the latest Market Watch issue that carries this breakdown.
| Home type | Sales | Average price |
|---|---|---|
| Detached | 5 | $1,988,000 |
| Semi-Detached | 15 | $1,703,482 |
| Att/Row/Townhouse | 17 | $1,358,412 |
| Condo Townhouse | 8 | $885,000 |
| Condo Apartment | 196 | $654,366 |
No sales recorded in September 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.
Toronto region: average sale price by year since 2013
| Month | Average sale price |
|---|---|
| 2013 | $525,681 |
| 2014 | $569,402 |
| 2015 | $623,529 |
| 2016 | $731,927 |
| 2017 | $823,422 |
| 2018 | $784,118 |
| 2019 | $812,989 |
| 2020 | $926,340 |
| 2021 | $1,098,088 |
| 2022 | $1,193,766 |
| 2023 | $1,131,219 |
| 2024 | $1,120,241 |
TRREB Market Watch, historic annual statistics.
TRREB Market Watch, district C01, published 2026-10-06.
Committee of Adjustment
hearings coming up
1
Updated daily · as of 21 November 2026
TapClick here to see the 1 hearings coming upHide the 1 hearings
Every hearing scheduled as of 21 November 2026, in the order it will be heard. Descriptions are the City’s own words.
Saturday 2 October
TBA · TBA
123 Edward St
To obtain consent to sever the property into two lots and to create new easements/rights-of-way.
File B0057/26TEY
City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-11-21.
Get next month’s edition
No app, no download, no password. Just one email, once a month.
Building permits
permits issued this month
121
September 2026
TapClick here to see what the 121 permits were forHide the 121 permits
22 Adelaide St W
- Proposed maglock related to permit # 26-195496 BLD 00 BA · Issued (Permit Issued)
- Interior alteration to existing office suite · Issued (Permit Issued)
- HVAC - Interior alteration to existing office suite · Issued (Permit Issued)
100 Adelaide St W
- Plumbing - Proposed interior alterations for tenant 'OMERS'. · Issued (Permit Issued)
- Proposed interior alterations for tenant 'OMERS'. · Issued (Permit Issued)
- HVAC - Proposal for an interior alteration · Issued (Permit Issued)
- HVAC - Proposed interior alterations for tenant 'OMERS'. · Issued (Permit Issued)
- HVAC - Proposed interior alterations of existing office suite - # 3900 · Issued (Permit Issued)
- Proposal for an interior alteration · Issued (Permit Issued)
- Proposed interior alterations of existing office suite - # 3900 · Issued (Permit Issued)
120 Adelaide St W
- HVAC - Proposal for interior alterations to existing office. Unit 1505. · Issued (Permit Issued)
- Plumbing - Proposal for interior alterations to existing office. Unit 1505. · Issued (Permit Issued)
- Proposal for interior alterations on Unit R11. · Issued (Permit Issued)
- Proposal for interior alterations to existing office. Unit 1505. · Issued (Permit Issued)
130 Adelaide St W
- Remove existing sprinklers as required c/w redundant 1" piping.-Relocate up to eighty-eight (88) pendent sprinklers.-Supply and install up to eleven (11) chrome semi-recessed pendent sprinklers.(refer to 26 156113)-Supply and install up to fifty-six (56) upright sprinklers. · Work under way (Inspection)
- Proposal for fire/security upgrade to install 2 double door maglocks on the 18th floor elevator lobby entrance. · Issued (Permit Issued)
141 Adelaide St W
- Proposal to install sidewall dry sprinklers on an existing outdoor patio. Ref. 26 107909 BLD 00 BA. · Issued (Permit Issued)
Total over the last 12 months
- Yonge–Bay Corridor
- 1,333
- Average Toronto neighbourhood this size
- about 204
City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.
Development applications
applications this quarter
1
July 2026 – September 2026
Total over the last 12 months
- Yonge–Bay Corridor
- 4
- Average Toronto neighbourhood this size
- about 2
TapClick here to see the 22 open applications Hide the 22 open applications
Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.
2 September 2026 · Site Plan Approval · Application Received
99 Gerrard St W, 700 Bay St
Proposed interior alterations to repurpose the existing building to create 249 purpose built rental units.
Application 26 231153 STE 11 SA
7 January 2026 · OPA / Rezoning · Under Review
57 Elm St, 59 Elm St, 61 Elm St and 4 more addresses
Proposed 18 storey building containing 234 hotel suites and retail space.
Application 26 101832 STE 11 OZ
7 April 2025 · Site Plan Approval · Under Review
60 Yonge St, 56 Yonge St
Proposed redevelopment of the 12-storey office building at 60 Yonge Street with a 65-storey mixed-use building that includes a 5-storey base building, topped with a 61-storey residential tower, for an overall building height of 246.2 metres (including the mechanical penthouse). A total of approximately 58 square metres of retail space is proposed on the ground floor, as well as 649 new residential units.
Application 25 140807 STE 13 SA
21 October 2024 · OPA / Rezoning · Under Review
53 Simcoe St, 55 Simcoe St, 145 Wellington St W
Combined Official Plan Amendment (OPA) & Zoning By-law Amendment (ZBA) application for a proposal to amend By-law 1015-2022, the proposed 65-storey residential tower with ground floor retail. The proposal includes 54,010 sqaure metres of residential GFA, 206.3 square metres of retail GFA and 861 dwelling units.
Application 24 229071 STE 10 OZ
9 August 2023 · Site Plan Approval · OMB Appeal
20 Front St W, 22 Front St W
Site Plan application for a 40-storey mixed-use building that would integrate the existing designated heritage building into the base of the tower and would contain approximately 625 square metres of retail space on the ground floor and 480 rental dwelling units above (including 16 affordable units).
Application 23 186068 STE 13 SA
City of Toronto Open Data — Development Applications, as of 2026-10-11.
Know a neighbour who’d want this?
It’s free, and there’s a new one every month.
How to read this
Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.
An application is a request, not an approval. Sale prices cover TRREB district C01, which may cover a wider area than Yonge–Bay Corridor alone.
The October 2026 safety report covers what was reported to police. Each figure names the period it covers.
Looking for another neighbourhood?
Nothing is sent anywhere — this check runs in your browser.