Property Snapshot

What is being built, applied for, and sold in Woodbine Corridor.

Home prices

The average across all homes sold in the district — not the price of any individual home.

average sale price

$1,283,941

August 2026 · 27 sales

$1.2M$1.4M$1.6M$1.8MAug 25Nov 25Feb 26May 26Aug 26

12-month average: $1,350,612.

Based on 27 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, July 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, July 2026
Home typeSalesAverage price
Detached15$1,689,033
Semi-Detached21$1,178,476
Att/Row/Townhouse2—
Condo Townhouse2—
Condo Apartment7$827,857

Att/Row/Townhouse: 2 sales; Condo Townhouse: 2 sales, too few to average.

No sales recorded in July 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

January – August 2026, across 332 sales
$1,367,426

TRREB Market Watch, district E02, published 2026-09-03. Updated when TRREB publishes the next Market Watch.

Average sale price by year

TRREB’s own average sale price by year, across the whole Toronto Regional Real Estate Board area — every district combined, not this neighbourhood alone.

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

Committee of Adjustment

Requests to build slightly outside the zoning rules, or to divide a lot. Each gets a public hearing.

hearings coming up

2

Updated daily · as of 6 October 2026

TapClick here to see the 2 hearings coming up

Every hearing scheduled as of 6 October 2026, in the order it will be heard. Descriptions are the City’s own words.

Wednesday 7 October

9:30 a.m. · Virtual Hearing / Committee Room 1, Second Floor, Toronto City Hall, 100 Queen St W, M5H 2N2

  • 69 Coxwell Ave

    To alter a 4-storey (13 m) detached building (houseplex with a total of six residential dwelling units (4 units will have double levels), as approved by Minor Variance Decision A0897/25TEY, by increasing the maximum building height to 5-storeys (17.24 m) with front and rear rooftop terraces.

    File A0538/26TEY

  • 16 Orchard Park Blvd

    To construct a new one-storey detached ancillary building (containing a one-car garage), in the rear yard, abutting the laneway.

    File A0589/26TEY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-06.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

Permission to start work that already meets the rules. Most are small: a deck, a furnace, or a basement.

permits issued this month

8

September 2026

Total over the last 12 months

Woodbine Corridor
150
Average Toronto neighbourhood this size
about 143
TapClick here to see what the 8 permits were for

Every permit issued in September 2026, grouped by address. One property often has several — a new building carries its own plumbing, drain and mechanical permits. Descriptions are the City’s own words, and the status is where each permit stands now, not when it was issued — so work that has since finished reads “Closed”, and the stages are explained on the About the data page.

  • 151 Bastedo Ave

    • Proposed second floor extension above the kitchen at rear side · Issued (Permit Issued)
    • Plumbing - Proposed second floor extension above the kitchen at rear side · Issued (Permit Issued)
  • 25 Edgewood Ave

    • install back water valve and sump pump · Work under way (Inspection)
  • 5 Fairmount Cres

    • Proposal for the enlargement of the front porch and canopy above the front entrance · Issued (Permit Issued)
  • 1926 Gerrard St E

    • Plumbing - Proposal for interior alterations to ground floor for new takeout bakery. · Issued (Permit Issued)
    • HVAC - Proposal for interior alterations to ground floor for new takeout bakery. · Issued (Permit Issued)
    • Proposal for interior alterations to ground floor for new takeout bakery. · Issued (Permit Issued)
  • 3 Murdock Ave

    • PROPOSAL FOR NEW 14' X 21' UNHEATED GARAGE · Issued (Permit Issued)

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-06.

Apply for a building permit

Development applications

A request to build something the current rules don’t allow — a rezoning, or a variance.

applications in the latest quarter on record

0

June 2026 – August 2026

Total over the last 12 months

Woodbine Corridor
0
Average Toronto neighbourhood this size
about 2
TapClick here to see the 6 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 16 April 2025 · OPA / Rezoning · Under Review

    4 Newbold Ave

    Combined Official Plan & Zoning By-law Amendement for a 10-storey residential rental apartment building with a height of 27.2 metres (30.2 metres with the MPH) consisting of 70 rental dwelling units including 13 rental replacement units. An underground parking lot is proposed consisting of no parking spaces and 75 bicycle parking spaces.

    Application 25 145839 STE 19 OZ

    On the City’s site →

  • 18 December 2024 · Site Plan Approval · Under Review

    2078 Danforth Ave, 2084 Danforth Ave, 2100 Danforth Ave and 4 more addresses

    Site Plan Control application to permit a 10- and 35-storey mixed-use building connected by a 1-storey podium, containing 601 rental dwelling units and 4,474.3 square metres of non-residential gross floor area. The application includes a privately owned public space (POPS), a grocery store, a preschool, and an institutional theatre space.

    Application 24 251716 STE 19 SA

    On the City’s site →

  • 9 December 2024 · OPA / Rezoning · Under Review

    1821 Danforth Ave

    Official Plan Amendment to permit a 10-storey mixed-use building, containing 60 rental dwelling units and 127 square metres of non-residential gross floor area. An Official Plan Amendment was requested to address conformity of the proposed built form with the underlying land use designation.This application is being reviewed and considered concurrently with a separate Zoning By-law Amendment application (File No. 19 186975 STE 19 OZ ) for the same proposal.

    Application 24 248345 STE 19 OZ

    On the City’s site →

  • 9 December 2024 · Site Plan Approval · Under Review

    1821 Danforth Ave

    Site Plan Control application to permit a 10-storey mixed-use building, containing 60 rental dwelling units and 127 square metres of non-residential gross floor area.

    Application 24 248357 STE 19 SA

    On the City’s site →

  • 11 July 2019 · OPA / Rezoning · Under Review

    1821 Danforth Ave

    INACTIVE Zoning By- Law Amendment Application to permit to permit a 10-storey mixed-use building, containing 60 rental dwelling units and 127 square metres of non-residential gross floor area. This application is being reviewed and considered concurrently with a separate Official Plan Amendment application (File No. 24 248345 STE 19 OZ) for the same proposal.

    Application 19 186975 STE 19 OZ

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-06. Refreshes automatically when the source publishes.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district E02, which may cover a wider area than Woodbine Corridor alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports