The Keelson · Woodbine Corridor

September 2026 edition

Property Snapshot

What is being built, applied for, and sold in Woodbine Corridor.

Home prices

average sale price

$1,283,941

August 2026 · 27 sales

$1.2M$1.4M$1.6M$1.8MAug 25Nov 25Feb 26May 26Aug 26

12-month average: $1,350,612.

Based on 27 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, August 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, August 2026
Home typeSalesAverage price
Detached8$2,022,725
Semi-Detached9$1,161,567
Att/Row/Townhouse1—
Condo Townhouse1—
Condo Apartment8$793,813

Att/Row/Townhouse: 1 sale; Condo Townhouse: 1 sale, too few to average.

No sales recorded in August 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district E02, published 2026-09-03.

Committee of Adjustment

hearings coming up

None scheduled

Updated daily · as of 11 October 2026

Decided in August 2026

1 — all approved

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-11.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

8

August 2026

TapClick here to see what the 8 permits were for
  • 152 Drayton Ave

    • HVAC - Proposal for interior alterations, toe footing and modify side deck. · Work under way (Inspection)
  • 2016 Dundas St E

    • Repair to existing rear deck and steps. · Issued (Permit Issued)
  • 95 Gainsborough Rd

    • Drain - Proposal to construct a new 2 storey garden suite with basement · Issued (Permit Issued)
    • Proposal to construct a new 2 storey garden suite with basement · Issued (Permit Issued)
  • 218 Gainsborough Rd

    • Proposal for interior sanitary line replacement and a backwater valve and a sump pump · Closed (Closed)
  • 40 Kingsmount Park Rd

    • The work is to repair the roof of a rowhouse unit damaged by tree impact. · Issued (Permit Issued)

Total over the last 12 months

Woodbine Corridor
148
Average Toronto neighbourhood this size
about 144

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

1

June 2026 – August 2026

Total over the last 12 months

Woodbine Corridor
3
Average Toronto neighbourhood this size
about 2
TapClick here to see the 8 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 2 February 2026 · Site Plan Approval · Under Review

    443-445 Coxwell Ave

    Proposed mid-rise self-storage facility of nine (9) storeys and 34.30 metres in height. Vehicular access is off of Coxwell Avenue, which leads to a covered customer service, parking and loading areas, including ten (10) parking spaces, two (2) loading spaces, and three (3) short-term bicycle parking spaces. The proposed mid-rise self-storage facility has a building area of 13,360.84 square metres.

    Application 26 112094 STE 19 SA

    On the City’s site →

  • 16 April 2025 · OPA / Rezoning · Under Review

    4 Newbold Ave

    Combined Official Plan & Zoning By-law Amendement for a 10-storey residential rental apartment building with a height of 27.2 metres (30.2 metres with the MPH) consisting of 70 rental dwelling units including 13 rental replacement units. An underground parking lot is proposed consisting of no parking spaces and 75 bicycle parking spaces.

    Application 25 145839 STE 19 OZ

    On the City’s site →

  • 9 December 2024 · OPA / Rezoning · Under Review

    1821 Danforth Ave

    Official Plan Amendment to permit a 10-storey mixed-use building, containing 60 rental dwelling units and 127 square metres of non-residential gross floor area. An Official Plan Amendment was requested to address conformity of the proposed built form with the underlying land use designation.This application is being reviewed and considered concurrently with a separate Zoning By-law Amendment application (File No. 19 186975 STE 19 OZ ) for the same proposal.

    Application 24 248345 STE 19 OZ

    On the City’s site →

  • 9 December 2024 · Site Plan Approval · Under Review

    1821 Danforth Ave

    Site Plan Control application to permit a 10-storey mixed-use building, containing 60 rental dwelling units and 127 square metres of non-residential gross floor area.

    Application 24 248357 STE 19 SA

    On the City’s site →

  • 7 November 2021 · Site Plan Approval · Under Review

    1684 Queen St E, 1702 Queen St E, 1698 Queen St E and 1 more address

    Site Plan Approval for a 6-storey mixed-use building having a non-residential gross floor area of 1120 square metres, and a residential gross floor area of 9201 square metres. 91 residential dwelling units are proposed.

    Application 21 235161 STE 19 SA

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district E02, which may cover a wider area than Woodbine Corridor alone.

The September 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports