Property Snapshot

What is being built, applied for, and sold in Wexford/Maryvale.

Home prices

The average across all homes sold in the district — not the price of any individual home.

average sale price

$753,670

August 2026 · 47 sales

$700K$800K$900KAug 25Nov 25Feb 26May 26Aug 26

12-month average: $783,225.

Based on 47 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, July 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, July 2026
Home typeSalesAverage price
Detached34$842,041
Semi-Detached6$755,600
Att/Row/Townhouse8$825,063
Condo Townhouse6$711,417
Condo Apartment12$420,917

No sales recorded in July 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

January – August 2026, across 418 sales
$784,584

TRREB Market Watch, district E04, published 2026-09-03. Updated when TRREB publishes the next Market Watch.

Average sale price by year

TRREB’s own average sale price by year, across the whole Toronto Regional Real Estate Board area — every district combined, not this neighbourhood alone.

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

Committee of Adjustment

Requests to build slightly outside the zoning rules, or to divide a lot. Each gets a public hearing.

hearings coming up

2

Updated daily · as of 6 October 2026

TapClick here to see the 2 hearings coming up

Every hearing scheduled as of 6 October 2026, in the order it will be heard. Descriptions are the City’s own words.

Wednesday 7 October

9:30 a.m. · Virtual Hearing/Committee Rooms 1 & 2, First Floor, SCC, 150 Borough Dr., M1P 4N7

  • 978 Pharmacy Ave

    To construct a six-storey apartment building containing 25 dwelling units. The existing one-storey dwelling will be demolished.

    File A0123/26SC

  • 1251 Warden Ave

    To construct a new six-storey apartment building. There will be a total of 25 dwelling units on the property, and the existing dwelling will be demolished.

    File A0124/26SC

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-06.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

Permission to start work that already meets the rules. Most are small: a deck, a furnace, or a basement.

permits issued this month

29

September 2026

Total over the last 12 months

Wexford/Maryvale
373
Average Toronto neighbourhood this size
about 280
TapClick here to see what the 29 permits were for

Every permit issued in September 2026, grouped by address. One property often has several — a new building carries its own plumbing, drain and mechanical permits. Descriptions are the City’s own words, and the status is where each permit stands now, not when it was issued — so work that has since finished reads “Closed”, and the stages are explained on the About the data page.

  • 17 Babcock Rd

    • Proposed addition of Backwater valve in Basement · Closed (Closed)
  • 125 Budea Cres

    • Proposal to construct a carport to the side of the house. · Issued (Permit Issued)
  • 84 Christina Cres

    • Propoal to construct an aluminum carport · Issued (Permit Issued)
  • 22 Dyson Blvd

    • Plumbing - PROPOSED-FINISH BASEMENT (PERSONAL USE) · Work under way (Inspection)
    • PROPOSED-FINISH BASEMENT (PERSONAL USE) · Work under way (Inspection)
  • 60 Elinor Ave

    • Proposed Backwater Valve Installation. · Work under way (Inspection)

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-06.

Apply for a building permit

Development applications

A request to build something the current rules don’t allow — a rezoning, or a variance.

applications in the latest quarter on record

1

June 2026 – August 2026

Total over the last 12 months

Wexford/Maryvale
4
Average Toronto neighbourhood this size
about 3
TapClick here to see the 26 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 8 June 2026 · Site Plan Approval · Under Review

    85 Ellesmere Rd

    Site Plan Amendment. seeking to amend a previous Site Plan Approval to reflect the existing conditions of Parkway Mall. The changes uncludes: 1.New commercial/retail pad buildings along the Victoria Park frontage (CRU D-1, and CRU E);2.The demolition of the southwest and southeast portions of the existing mall;3. Intersection upgrades at Victoria Park Avenue and Combermere Drive associated with proposed building CRU E and;4.Landscaping and parking changes associated with proposed buildings CRU D-1 and CRU E.The purpose of this application is to amend the previous Site Plan Approval to reflect the existing conditions and release the remaining securities tied to the changes that were not advanced.There is no proposed construction as part of this application.

    Application 26 180009 ESC 21 SA

    On the City’s site →

  • 9 December 2025 · Site Plan Approval · Under Review

    1370 Birchmount Rd

    Development of a three-storey multi-unit industrial building, comprising two floors of individual warehouse condominium units and a third floor of small industrial warehouse units, with a total gross floor area of 8,676.83 m².

    Application 25 264480 ESC 21 SA

    On the City’s site →

  • 5 November 2025 · Condominium Approval · Under Review

    1430 Birchmount Rd

    Draft Plan of Condominium. The proposed development contains two 3-storey warehouse units. Building A contains 29 Industrial units and 186 Work/Storage units. Building B contains 16 Industrial units and 88 Work/Storage units.

    Application 25 249692 ESC 21 CD

    On the City’s site →

  • 25 July 2025 · Site Plan Approval · Under Review

    1870 Birchmount Rd, 1880 Birchmount Rd

    Proposal of adding another warehouse of 2922.4 sqm attached to the existing warehouse building.

    Application 25 200349 ESC 21 SA

    On the City’s site →

  • 25 July 2025 · OPA / Rezoning · Under Review

    2130 Lawrence Ave E

    Proposal for redevelop the Subject Lands with two residential high-rise buildings withheights of 36 and 40 storeys and a 15 storey mixed-use mid-rise building with a total net FSI of 7.96. Proposed total floor area 88,265.1 sq. m. (950,078 sq.ft.), consisting of 86,387.2 sq. m. (929,865 sq. ft.) of residential space and 1,877.8 sq. m. (20,213 sq. ft.) of retail space. This provides 1,303 apartment units, 3,470.4 sq. m indoor amenity space and 1,748.7 sq. m outdoor amenity space, and 1,078 parking spaces, 992 bicycle parking spaces.

    Application 25 200375 ESC 21 OZ

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-06. Refreshes automatically when the source publishes.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district E04, which may cover a wider area than Wexford/Maryvale alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports