Property Snapshot

What is being built, applied for, and sold in Tam O'Shanter–Sullivan.

Home prices

The average across all homes sold in the district — not the price of any individual home.

average sale price

$843,494

August 2026 · 50 sales

$700K$800K$900K$1.0MAug 25Nov 25Feb 26May 26Aug 26

12-month average: $832,499.

Based on 50 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, July 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, July 2026
Home typeSalesAverage price
Detached31$1,140,123
Semi-Detached3$873,333
Att/Row/Townhouse1—
Condo Townhouse12$660,766
Condo Apartment26$523,742
Link1—

Att/Row/Townhouse: 1 sale; Link: 1 sale, too few to average.

No sales recorded in July 2026: Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

January – August 2026, across 375 sales
$820,758

TRREB Market Watch, district E05, published 2026-09-03. Updated when TRREB publishes the next Market Watch.

Average sale price by year

TRREB’s own average sale price by year, across the whole Toronto Regional Real Estate Board area — every district combined, not this neighbourhood alone.

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

Committee of Adjustment

Requests to build slightly outside the zoning rules, or to divide a lot. Each gets a public hearing.

hearings coming up

2

Updated daily · as of 6 October 2026

Decided in September 2026

1 — all approved

TapClick here to see the 2 hearings coming up

Every hearing scheduled as of 6 October 2026, in the order it will be heard. Descriptions are the City’s own words.

Wednesday 7 October

9:30 a.m. · Virtual Hearing/Committee Rooms 1 & 2, First Floor, SCC, 150 Borough Dr., M1P 4N7

  • 186 Allanford Rd

    To construct a three-storey apartment building with 10 dwelling units.

    File A0114/26SC

  • 34 Farmcrest Dr

    To construct a new attached garage and a second-storey addition above the garage to accommodate a secondary suite.

    File A0117/26SC

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-06.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

Permission to start work that already meets the rules. Most are small: a deck, a furnace, or a basement.

permits issued this month

11

September 2026

Total over the last 12 months

Tam O'Shanter–Sullivan
139
Average Toronto neighbourhood this size
about 283
TapClick here to see what the 11 permits were for

Every permit issued in September 2026, grouped by address. One property often has several — a new building carries its own plumbing, drain and mechanical permits. Descriptions are the City’s own words, and the status is where each permit stands now, not when it was issued — so work that has since finished reads “Closed”, and the stages are explained on the About the data page.

  • 16 Bugle Hill Rd

    • Proposed a second floor over existing structure and over the new garage, adding new unit above the garage, (total 3 unit at the building) side addition on the ground floor, and interior alterations in basement and ground floor. · Issued (Permit Issued)
  • 27 Castledene Cres

    • Proposed installation sanitary line backwater valve. · Issued (Permit Issued)
  • 45 Castledene Cres

    • Proposal for a 2nd floor side addition at the front above existing garage & a 2-storey plus basement side addition at the rear. [Tied to 26 118262 ZAP 00 ZR & MV file no. A0037/26SC - F&B.] · Issued (Permit Issued)
    • Plumbing - 2nd floor addition above existing garage, 2 storey side addition, interior renovations. · Issued (Permit Issued)
    • Drain - 2nd floor addition above existing garage, 2 storey side addition, interior renovations. · Issued (Permit Issued)
  • 21 Davisbrook Blvd

    • HVAC - Proposed restoration of fire damaged dwelling to original condition. · Issued (Permit Issued)
  • 9 Greenberry Pl

    • Back water valve installation · Work under way (Inspection)

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-06.

Apply for a building permit

Development applications

A request to build something the current rules don’t allow — a rezoning, or a variance.

applications in the latest quarter on record

3

June 2026 – August 2026

Total over the last 12 months

Tam O'Shanter–Sullivan
4
Average Toronto neighbourhood this size
about 3
TapClick here to see the 19 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 17 August 2026 · Site Plan Approval · Under Review

    3260 Sheppard Ave E

    Site Plan Amending Application for the previously approved Site Plan No. 13 -240117 ESC 40 SA related to Phase 3 of the development located on the newly constructed road, 2 Cherry Blossom Gardens. The intent of this application is to increase the number of residential units from 805 to 821.

    Application 26 221108 ESC 22 SA

    On the City’s site →

  • 9 July 2026 · Condominium Approval · Under Review

    2992 Sheppard Ave E

    Condominium Approval fo 158 residential dwelling units.

    Application 26 198879 ESC 22 CD

    On the City’s site →

  • 24 June 2026 · Condominium Approval · Under Review

    3260 Sheppard Ave E

    Phased Draft Plan of Condominium for 176 residential dwelling units.

    Application 26 190878 ESC 22 CD

    On the City’s site →

  • 19 March 2026 · OPA / Rezoning · Under Review

    3719 Sheppard Ave E, 2255 Birchmount Rd, 3721 Sheppard Ave E and 2 more addresses

    OPA for proposal to construct a new 24-storey mixed-use building, containing 309 newrental dwelling units and a total of 27,392 sq. m of gross floor area (GFA), including 709 sq. mof non-residential GFA, resulting in a Floor Space Index (FSI) of approximately 6.05

    Application 26 131938 ESC 22 OZ

    On the City’s site →

  • 25 August 2025 · OPA / Rezoning · Under Review

    3719 Sheppard Ave E, 2255 Birchmount Rd, 3721 Sheppard Ave E and 2 more addresses

    Proposal to construct a new 24-storey mixed-use building, containing 309 newrental dwelling units and a total of 27,392 sq. m of gross floor area (GFA), including 709 sq. mof non-residential GFA, resulting in a Floor Space Index (FSI) of approximately 6.05

    Application 25 215644 ESC 22 OZ

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-06. Refreshes automatically when the source publishes.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district E05, which may cover a wider area than Tam O'Shanter–Sullivan alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.