Property Snapshot

What is being built, applied for, and sold in St. Andrew–Windfields.

Home prices

average sale price

$2,779,588

September 2026 · 17 sales

$1.0M$2.0M$3.0M$4.0MSep 25Dec 25Mar 26Jun 26Sep 26

12-month average: $2,842,501.

Based on 17 sales in September 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, September 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, September 2026
Home typeSalesAverage price
Detached10$3,835,800
Semi-Detached1—
Condo Townhouse1—
Condo Apartment5$1,444,200

Semi-Detached: 1 sale; Condo Townhouse: 1 sale, too few to average.

No sales recorded in September 2026: Att/Row/Townhouse, Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district C12, published 2026-10-06.

Committee of Adjustment

hearings coming up

None scheduled

Updated daily · as of 22 November 2026

Decided in September 2026

1 — all approved

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-11-22.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

37

September 2026

TapClick here to see what the 37 permits were for
  • 28 Bobwhite Cres

    • HVAC - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement.See also 25 186692 DEM and 25 109634 ZAP · Issued (Permit Issued)
  • 23 Carluke Cres

    • HVAC - To construct a new 3-storey single detached dwelling with basement walkout, front porch and rear deck · Issued (Permit Issued)
  • 36 Chieftain Cres

    • PROPOSED NEW FULLY DETACHED TWO UNIT DWELLING · Issued (Permit Issued)
    • PROPOSED NEW FULLY DETACHED TWO UNIT DWELLING · Issued (Permit Issued)
    • Drain - PROPOSED NEW FULLY DETACHED TWO UNIT DWELLING · Issued (Permit Issued)
    • Plumbing - PROPOSED NEW FULLY DETACHED TWO UNIT DWELLING · Issued (Permit Issued)
  • 8 Crimson Millway

    • Proposed interior alterations to existing second-floor primary bedroom and ensuite washroom. · Issued (Permit Issued)
  • 25 Dempsey Cres

    • interior backwater valve · Closed (Closed)

Total over the last 12 months

St. Andrew–Windfields
260
Average Toronto neighbourhood this size
about 173

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

1

July 2026 – September 2026

Total over the last 12 months

St. Andrew–Windfields
4
Average Toronto neighbourhood this size
about 2
TapClick here to see the 11 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 7 August 2026 · OPA / Rezoning · Under Review

    10-36 York Mills Rd

    Proposal of two residential mixed-use towers of 55 and 40 storeys (176.2 and 132.5 metres, exclusive of the mechanical penthouses), with approximately 903 dwelling units in a mix of unit types, including 267 rental units. The proposal is comprised of a total GFA of 85,220 square metres, consisting of approximately 82,336 square metres of residential GFA and 2,884 square metres of non-residential GFA, resulting in a density of 9.77 FSI on the development site and 3.24 on the subject lands.

    Application 26 215914 NNY 15 OZ

    On the City’s site →

  • 29 January 2026 · Site Plan Approval · Application Received

    2621 Bayview Ave, 2619 Bayview Ave

    Site Plan Control Application proposes the development of a 6-storey residential building.The building will provide a total of 60 residential units, being a mix of 1-bedroom, 1-bedroom + den, 2-bedroom, 2-bedroom + den, and 3-bedroom units. A paved access from Heathcoat Ave along the eastern property line will be provided, leading to 1 level of below-grade parking, providing a total of 81 parking spaces; as well as 66 bicycle parking spaces. The proposed development provides a total GFA of 8,049 square metres and a FSI of 2.56. Additionally, the proposed development provides 451 square metres of indoor amenity space and 132 square metres of outdoor amenity space.

    Application 26 110385 NNY 15 SA

  • 6 August 2025 · Site Plan Approval · Under Review

    800 York Mills Rd

    Proposed redevelopment of the existing Petro Canada gas station located at 800 York Mills Rd. The redevelopment includes the construction of new gas pumps and canopy, a new convenience store/quick-service KFC restaurant with an associated drive-through facility, and comprehensivelandscaping throughout the property. The existing car wash facilities and existing fuel tank nest will remain a part of the development.

    Application 25 205890 NNY 16 SA

    On the City’s site →

  • 29 April 2025 · OPA / Rezoning · Under Review

    2654 Bayview Ave, 2656 Bayview Ave, 2660 Bayview Ave and 1 more address

    OPA and Zoning By-law Amendment Application proposes the development of a 7-storey residential building. The building will provide a total of 168 residential units, being a mix of 1-bedroom, 2-bedroom and 3-bedrooms. A paved access from Bayview Ave along the southern property line will be provided, leading to 2 levels of below-grade parking, providing a total of 184 parking spaces; as well as 127 bicycle parking spaces. The proposed development provides a total GFA of 22,102.00 square metres and a FSI of 2.85. Additionally, the proposed development provides 336.00 square metres of indoor amenity space and 680.00 square metres of outdoor amenity space.

    Application 25 151165 NNY 15 OZ

    On the City’s site →

  • 15 October 2024 · Site Plan Approval · Under Review

    16 Lesmill Rd, 840 York Mills Rd, 842 York Mills Rd and 1 more address

    The Site Plan application proposes the development of six (6) one (1)-storey industrial buildings, five (5) of which are multi-tenant industrial buildings. The proposal includes ultimate severance of the property into two (2) lots.

    Application 24 226520 NNY 16 SA

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C12, which may cover a wider area than St. Andrew–Windfields alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports