Property Snapshot

What is being built, applied for, and sold in Rosedale–Moore Park.

Home prices

average sale price

$2,728,952

September 2026 · 21 sales

$1.0M$2.0M$3.0M$4.0MSep 25Dec 25Mar 26Jun 26Sep 26

12-month average: $2,522,993.

Based on 21 sales in September 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, September 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, September 2026
Home typeSalesAverage price
Detached6$7,185,000
Semi-Detached1—
Condo Townhouse1—
Condo Apartment12$768,167
Co-Op Apartment1—

Semi-Detached: 1 sale; Condo Townhouse: 1 sale; Co-Op Apartment: 1 sale, too few to average.

No sales recorded in September 2026: Att/Row/Townhouse, Link, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district C09, published 2026-10-06.

Committee of Adjustment

hearings coming up

2

Updated daily · as of 22 November 2026

Decided in September 2026

9 — 8 approved, 1 refused

TapClick here to see the 2 hearings coming up

Every hearing scheduled as of 22 November 2026, in the order it will be heard. Descriptions are the City’s own words.

Wednesday 25 November

2:00 p.m. · Virtual Hearing / Committee Room 2, Second Floor, Toronto City Hall, 100 Queen Street W, M5H 2N2

  • 83 Glen Rd

    To alter the existing three-storey detached dwelling by constructing a rear two-storey addition with a basement extension, a rear one-storey addition, a one-storey addition to the existing bay on the south side, a rear second storey balcony, and a new rear ground floor terrace with stairs. The existing rear porch with stairs and patio, rear ground floor deck with stairs, and side (north) ancillary building (shed), will be demolished.

    File A0704/26TEY

Wednesday 9 December

9:30 a.m. · Virtual Hearing / Committee Room 3, Second Floor, Toronto City Hall, 100 Queen Street W, M5H 2N2

  • 33 Astley Ave

    To construct a new three-storey detached dwelling with a covered front porch and architectural features (pilasters), an integral garage (containing two-car parking spaces and a car lift), an oversized front driveway, a front third storey balcony, a rear basement walkout (lower terrace), and a rear first level covered and uncovered porch with stairs. Also, to construct a rear ground floor paverstone terrace, a rear retaining wall along the paverstone terrace, and an inground swimming pool.

    File A0652/26TEY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-11-22.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

28

September 2026

TapClick here to see what the 28 permits were for
  • 15 Astley Ave

    • backwater valve installation · Work under way (Inspection)
  • 10 Avoca Ave

    • Proposal for garage repair · Closed (Closed)
  • 2 Bloor St E

    • HVAC - Proposal for interior alterations to demo existing car rental kiosk to build a new kiosk. · Issued (Permit Issued)
  • 74 Chestnut Pk

    • proposal for interior alterations and underpinning · Work under way (Inspection)
    • Drain - proposal for interior alterations and underpinning · Issued (Permit Issued)
    • Plumbing - proposal for interior alterations and underpinning · Issued (Permit Issued)
  • 15 Douglas Dr

    • Install sanitary line backwater valve · Work under way (Inspection)

Total over the last 12 months

Rosedale–Moore Park
438
Average Toronto neighbourhood this size
about 270

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

0

July 2026 – September 2026

Total over the last 12 months

Rosedale–Moore Park
4
Average Toronto neighbourhood this size
about 3
TapClick here to see the 19 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 16 June 2026 · Site Plan Approval · Under Review

    1 Heath St E, 1497 Yonge St, 1501 Yonge St and 9 more addresses

    Mixed use development consisting of three towers organized around a central publicly accessible open space (POPS), along with a new 1,560 m² public park at the northwest corner of the site. The development would include 661 residential units, approximately 15,627 m² of retail, restaurant, wellness and other non-residential uses, and a network of mid-block pedestrian connections, including a direct connection to St. Clair Subway Station. The proposal also incorporates a shared podium for Towers 1 and 2, a standalone Tower 3 connected by an enclosed bridge, and below-grade vehicular, loading and servicing facilities to support a pedestrian-focused public realm.

    Application 26 185667 STE 12 SA

    On the City’s site →

  • 22 April 2026 · OPA / Rezoning · Under Review

    2 Bloor St E, 90 Bloor St E, 80 Bloor St E

    Zoning By-law Amendment to permit a self-storage warehouse use on floors 2-5 (formely The Bay retail space). The existing ground floor retail unit will be maintained. Access for loading and parking will be from Asquith Avenue. No new development is proposed on site.

    Application 26 148240 STE 11 OZ

    On the City’s site →

  • 12 August 2025 · OPA / Rezoning · OMB Appeal

    38 Park Rd, 50 Park Rd, 40 Park Rd

    Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development includes 289 purpose-built dwelling units, inclusive of 40 rental replacement units and 249 new market rental dwelling units.

    Application 25 209063 STE 11 OZ

    On the City’s site →

  • 28 May 2025 · OPA / Rezoning · Under Review

    9 Price St, 1091 Yonge St, 1087 Yonge St

    Official Plan and Zoning By-law Amendment application to permit a 35-storey mixed-use building, containing 235 dwelling units and 1,645 square metres of non-residential gross floor area.

    Application 25 166443 STE 11 OZ

    On the City’s site →

  • 6 July 2022 · Site Plan Approval · Under Review

    350 Bloor St E

    Proposal to construct a 63-storey mixed-use building on the subject site. The existing six-storey office building will be replaced. Approximately 486 square metres of retail is proposed at grade, with approximately 8,259 square metres of office space proposed on floors one to seven, and approximately 39,356 square metres of residential gross floor area proposed on floors seven to 63. The proposed building will include approximately 675 new dwelling units (in a mix of studio, one-bedroom, two-bedroom, and three-bedroom units) and will provide 74 vehicular parking spaces and 713 bicycle parking spaces underground.

    Application 22 172659 STE 11 SA

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C09, which is wider than Rosedale–Moore Park alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports