September 2026 edition
Property Snapshot
What is being built, applied for, and sold in Regent Park.
Home prices
average sale price
$692,887
August 2026 · 135 sales
12-month average: $704,048.
| Month | Average sale price |
|---|---|
| Aug 2025 | $629,645 |
| Sep 2025 | $810,932 |
| Oct 2025 | $726,078 |
| Nov 2025 | $762,451 |
| Dec 2025 | $640,731 |
| Jan 2026 | $690,876 |
| Feb 2026 | $677,108 |
| Mar 2026 | $639,106 |
| Apr 2026 | $687,016 |
| May 2026 | $699,809 |
| Jun 2026 | $678,376 |
| Jul 2026 | $719,427 |
| Aug 2026 | $692,887 |
Based on 135 sales in August 2026.
TapClick to see what your type of home is selling forHide the home types
Sales and average price by major home type, August 2026 — the latest Market Watch issue that carries this breakdown.
| Home type | Sales | Average price |
|---|---|---|
| Att/Row/Townhouse | 3 | $1,216,667 |
| Condo Townhouse | 4 | $923,750 |
| Condo Apartment | 128 | $673,397 |
No sales recorded in August 2026: Detached, Semi-Detached, Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.
Toronto region: average sale price by year since 2013
| Month | Average sale price |
|---|---|
| 2013 | $525,681 |
| 2014 | $569,402 |
| 2015 | $623,529 |
| 2016 | $731,927 |
| 2017 | $823,422 |
| 2018 | $784,118 |
| 2019 | $812,989 |
| 2020 | $926,340 |
| 2021 | $1,098,088 |
| 2022 | $1,193,766 |
| 2023 | $1,131,219 |
| 2024 | $1,120,241 |
TRREB Market Watch, historic annual statistics.
TRREB Market Watch, district C08, published 2026-09-03.
Committee of Adjustment
hearings coming up
1
Updated daily · as of 11 October 2026
TapClick here to see the 1 hearings coming upHide the 1 hearings
Every hearing scheduled as of 11 October 2026, in the order it will be heard. Descriptions are the City’s own words.
Wednesday 14 October
2:00 p.m. · Virtual Hearing / Committee Room 1, Second Floor, Toronto City Hall, 100 Queen St W, M5H 2N2
60 Wascana Ave
To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.
File A0544/26TEY
City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-11.
Get next month’s edition
No app, no download, no password. Just one email, once a month.
Building permits
permits issued this month
4
August 2026
TapClick here to see what the 4 permits were forHide the 4 permits
620 Dundas St E
- The installation of two 5500 MBH condensing gas-fired boilers, one 1500 ton chiller and cooling towers, and ancillary equipment in the penthouse mechanical room. Additionally, the installation of pressure break heat exchangers in the P1 level, as well as distribution pumps and piping to interconnect with RPEI's existing district energy system. · Issued (Revision Issued)
- The addition of office space (i.e. fit up) adjacent to the RPEI penthouse district energy centre, including washroom and kitchen. · Issued (Permit Issued)
365 Parliament St
- Total of 4 first party signs ( ( 2 Wall Sign +2 Projecting Signs), all illuminated and displaying static copy and all on the 1 storey Sign 1 Wall Sign 0.47m L x 1.36m W x 0.23m D x 3.92m H above Grade, Sign Face area of 0.64 square metres, North elevation, first storey Sign 2 Projecting Sign , Double-Sided, 0.91m L x 0.91m W x 0.10m D x 4.36m H above Grade, Sign Face area of 0.83 square metres per side, North elevation, first storeySign 3 Wall Sign 0.47m L x 1.36m W x 0.23m D x 3.92m H above Grade, Sign Face area of 0.64 square metres, NW elevation, First StoreySign 4 Projecting Sign, Double-Sided, 0.91m L x 0.91m W x 0.10m D x 4.36m H above Grade, Sign Face area of 0.83 square metres per side, West elevation, First Storey ***BMO*** · Issued (Permit Issued)
6 Wascana Ave
- Proposal to replace deteriorating brick facade of existing dwelling · Issued (Permit Issued)
Total over the last 12 months
- Regent Park
- 76
- Average Toronto neighbourhood this size
- about 168
City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.
Development applications
applications this quarter
0
June 2026 – August 2026
Total over the last 12 months
- Regent Park
- 2
- Average Toronto neighbourhood this size
- about 2
TapClick here to see the 5 open applications Hide the 5 open applications
Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.
30 September 2026 · OPA / Rezoning · Application Received
7 Labatt Ave, 77 River St
Proposed 46-storey residential building and a 2-storey non-residential building. Overall, the buildings contain a total of 1,170 dwelling units, 72,748.1 sq. m of residential Gross Floor Area and 1,110.8 sq. m. of non-residential GFA, resulting in a Floor Space Index of approximately 13.67.
Application 26 246687 STE 13 OZ
8 October 2025 · OPA / Rezoning · Under Review
747 Dundas St E, 749 Dundas St E, 755 Dundas St E and 2 more addresses
Official Plan and Zoning By-law Amendment application for a mixed-use development comprised of two 48-storey towers containing approximately 1,197 residential units and 1,300 square metres of non-residential GFA. The proposal includes a 729 square metre park and 245 square metre natural heritage open space.
Application 25 236949 STE 13 OZ
20 April 2022 · OPA / Rezoning · OMB Appeal
591 Dundas St E, 325 Gerrard St E
Zoning By-law Amendment application for Phases 4 & 5 of the Regent Park redevelopment. The Phases 4 & 5 lands are generally bounded by Gerrard Street to the north, River Street to the east, Oak Street to the south, and Dreamers Way to the west. The proposal consists of a total gross floor area (GFA) of 320,064 m2 comprised of approximately 303,616 m2 of residential GFA and approximately 16,452 m2 of non-residential GFA across 13 buildings (including a new Toronto Public Library branch relocated from Parliament Street). The proposal includes approximately 3,246 residential units, of which 1,976 will be market units and 1,270 will be TCHC-owned rental units.
Application 22 136063 STE 13 OZ
4 November 2021 · Condominium Approval · Under Review
111 River St, 113 River St, 115 River St and 5 more addresses
*** Draft plan of condominium for 430 units.
Application 21 234388 STE 13 CD
31 October 2019 · Site Plan Approval · Under Review
7 Labatt Ave, 77 River St
INACTIVE Site Plan Approval Application for a proposed 38-storey mixed-use building with 548 residential units (rental and condominium), 4752 square metres of non-residential floor area (retail, office and a Salvation Army facility), and two levels of below grade parking.
Application 19 243731 STE 13 SA
City of Toronto Open Data — Development Applications, as of 2026-10-11.
Know a neighbour who’d want this?
It’s free, and there’s a new one every month.
How to read this
Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.
An application is a request, not an approval. Sale prices cover TRREB district C08, which may cover a wider area than Regent Park alone.
The September 2026 safety report covers what was reported to police. Each figure names the period it covers.
Looking for another neighbourhood?
Nothing is sent anywhere — this check runs in your browser.