October 2026 edition
Property Snapshot
What is being built, applied for, and sold in Old East York.
Home prices
average sale price
$1,122,091
September 2026 · 66 sales
12-month average: $1,151,362.
| Month | Average sale price |
|---|---|
| Sep 2025 | $1,229,621 |
| Oct 2025 | $1,117,671 |
| Nov 2025 | $1,151,426 |
| Dec 2025 | $1,003,530 |
| Jan 2026 | $954,196 |
| Feb 2026 | $1,192,333 |
| Mar 2026 | $1,167,517 |
| Apr 2026 | $1,192,406 |
| May 2026 | $1,250,527 |
| Jun 2026 | $1,233,011 |
| Jul 2026 | $1,086,847 |
| Aug 2026 | $1,100,458 |
| Sep 2026 | $1,122,091 |
Based on 66 sales in September 2026.
TapClick to see what your type of home is selling forHide the home types
Sales and average price by major home type, September 2026 — the latest Market Watch issue that carries this breakdown.
| Home type | Sales | Average price |
|---|---|---|
| Detached | 48 | $1,222,315 |
| Semi-Detached | 9 | $1,084,556 |
| Att/Row/Townhouse | 4 | $814,472 |
| Condo Apartment | 5 | $473,600 |
No sales recorded in September 2026: Condo Townhouse, Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.
Toronto region: average sale price by year since 2013
| Month | Average sale price |
|---|---|
| 2013 | $525,681 |
| 2014 | $569,402 |
| 2015 | $623,529 |
| 2016 | $731,927 |
| 2017 | $823,422 |
| 2018 | $784,118 |
| 2019 | $812,989 |
| 2020 | $926,340 |
| 2021 | $1,098,088 |
| 2022 | $1,193,766 |
| 2023 | $1,131,219 |
| 2024 | $1,120,241 |
TRREB Market Watch, historic annual statistics.
TRREB Market Watch, district E03, published 2026-10-06.
Committee of Adjustment
hearings coming up
2
Updated daily · as of 22 November 2026
TapClick here to see the 2 hearings coming upHide the 2 hearings
Every hearing scheduled as of 22 November 2026, in the order it will be heard. Descriptions are the City’s own words.
Wednesday 9 December
9:30 a.m. · Virtual Hearing / Committee Room 3, Second Floor, Toronto City Hall, 100 Queen Street W, M5H 2N2
266 Torrens Ave
To alter the existing two-storey detached dwelling by constructing a new roof above the existing front porch. Also, to permit the existing widened driveway, which was constructed without an authorized building permit.
File A0745/26TEY
Wednesday 16 December
9:30 a.m. · Virtual Hearing / Committee Room 2, Second Floor, Toronto City Hall, 100 Queen Street W, M5H 2N2
62 Lankin Blvd
To construct a new two-storey detached dwelling with a front integral garage (with a one-car parking space in the basement level), a front covered porch with stairs, a rear basement walkout, a rear covered ground floor deck with stairs and a rear second floor balcony.
File A0765/26TEY
City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-11-22.
Get next month’s edition
No app, no download, no password. Just one email, once a month.
Building permits
permits issued this month
36
September 2026
TapClick here to see what the 36 permits were forHide the 36 permits
93 Binswood Ave
- Proposed to demolish existing porch and build new 7.86m² including the steps. · Issued (Permit Issued)
16 Chilton Rd
- Proposal for new back water valve and drain replacement. · Closed (Closed)
59 Chilton Rd
- HVAC - Proposal to construct Finished Basement, 1 bathroom on the second floor, enlarging 2 windows on the second floor & removal of load bearing wall on the main floor. · Issued (Permit Issued)
10 Coxwell Blvd
- Proposed second floor and 2 story side rear addition and interior alterations( 75 sq.m.) and front and rear conc. porch · Issued (Permit Issued)
- HVAC - Proposed second floor and 2 story side rear addition and interior alterations( 75 sq.m.) and front and rear conc. porch · Issued (Permit Issued)
- Drain - Proposed second floor and 2 story side rear addition and interior alterations( 75 sq.m.) and front and rear conc. porch · Issued (Permit Issued)
- Plumbing - Proposed second floor and 2 story side rear addition and interior alterations( 75 sq.m.) and front and rear conc. porch · Issued (Permit Issued)
304 Donlands Ave
- Plumbing - PROPOSED ADDITIONS (ENLARGING THE FRONT PORCH WITH ENCLOSURE, 3.72 m2) AND ALTERATIONS (UNDERPINNING, 29.24 m AND 2ND UNIT, 48.66 m2 IN THE BASEMENT, REMOVAL LOAD BEARING WALLS, 2.8 m2 IN THE 1ST & BASEMENT FLOORS) TO EXISTIING TWO (2) STOREY BRICK DWELLING. · Issued (Permit Issued)
- Drain - PROPOSED ADDITIONS (ENLARGING THE FRONT PORCH WITH ENCLOSURE, 3.72 m2) AND ALTERATIONS (UNDERPINNING, 29.24 m AND 2ND UNIT, 48.66 m2 IN THE BASEMENT, REMOVAL LOAD BEARING WALLS, 2.8 m2 IN THE 1ST & BASEMENT FLOORS) TO EXISTIING TWO (2) STOREY BRICK DWELLING. · Issued (Permit Issued)
- One Storey Rear Addition(Basement Walkout Enclosure)+Underpinning+Second Suite+Interior Alteration · Work under way (Inspection)
Total over the last 12 months
- Old East York
- 199
- Average Toronto neighbourhood this size
- about 102
City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.
Development applications
applications this quarter
0
July 2026 – September 2026
Total over the last 12 months
- Old East York
- 0
- Average Toronto neighbourhood this size
- about 1
City of Toronto Open Data — Development Applications, as of 2026-10-11.
Know a neighbour who’d want this?
It’s free, and there’s a new one every month.
How to read this
Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.
An application is a request, not an approval. Sale prices cover TRREB district E03, which may cover a wider area than Old East York alone.
The October 2026 safety report covers what was reported to police. Each figure names the period it covers.
Looking for another neighbourhood?
Nothing is sent anywhere — this check runs in your browser.