Property Snapshot

What is being built, applied for, and sold in O'Connor–Parkview.

Home prices

average sale price

$1,122,091

September 2026 · 66 sales

$900K$1.0M$1.1M$1.2M$1.3MSep 25Dec 25Mar 26Jun 26Sep 26

12-month average: $1,151,362.

Based on 66 sales in September 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, September 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, September 2026
Home typeSalesAverage price
Detached48$1,222,315
Semi-Detached9$1,084,556
Att/Row/Townhouse4$814,472
Condo Apartment5$473,600

No sales recorded in September 2026: Condo Townhouse, Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district E03, published 2026-10-06.

Committee of Adjustment

hearings coming up

2

Updated daily · as of 22 November 2026

Decided in September 2026

1 — all approved

TapClick here to see the 2 hearings coming up

Every hearing scheduled as of 22 November 2026, in the order it will be heard. Descriptions are the City’s own words.

Wednesday 9 December

9:30 a.m. · Virtual Hearing / Committee Room 3, Second Floor, Toronto City Hall, 100 Queen Street W, M5H 2N2

  • 6 Park Vista

    To alter the existing 10-storey apartment building by converting the second floor laundry room, the third floor storage room, and locker rooms on the fourth through ninth floors (all located on the south side of the building) into eight residential dwelling units. Also, to convert the ground floor storage and mechanical room (located on the south side of the building) into a laundry room with amenity space (meeting room/lounge) and a maintenance area. Also, the southeast portion of the ground floor lobby will be converted into an additional amenity space (meeting room/lounge). There will be five short-term bicycle parking spaces and no long-term bicycle parking spaces provided. Four lawfully existing tenant parking spaces will be converted into three visitor parking spaces and one accessible parking space. There will be a total of 116 residential dwelling units and 123 parking spaces on this lot.

    File A0124/26TEY

  • 25 Marilyn Cres

    To permit and maintain the existing front covered porch (enlarged and extended vertically to the second level) with stairs, a front ground floor bay window, a side (north) ground floor interior den/room (above the garage), a side (north) one-storey addition, and the building height, which were constructed beyond the limits of an authorized building permit (No. 20 11 181811 BLD) for the two-storey detached dwelling.

    File A0748/26TEY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-11-22.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

32

September 2026

TapClick here to see what the 32 permits were for
  • 32 Cranfield Rd

    • Site servicing works including installation of SWM tank and storm connection to the municipal storm sewer system. · Work under way (Inspection)
  • 18 Galbraith Ave

    • Proposal to construct a new three-storey detached building with front and rear basement walkouts, front and rear ground floor porches with stairs, front and rear third storey planter boxes, and front and rear third storey balconies. There will be a total of five residential dwelling units on this lot. · Issued (Permit Issued)
    • Proposal to construct a new three-storey detached building with front and rear basement walkouts, front and rear ground floor porches with stairs, front and rear third storey planter boxes, and front and rear third storey balconies. There will be a total of five residential dwelling units on this lot. · Issued (Permit Issued)
    • Proposal to demolish existing dwelling and construct 2 new multi unit (5 units) dwelling. · Issued (Permit Issued)
    • Plumbing - Proposal to construct a new three-storey detached building with front and rear basement walkouts, front and rear ground floor porches with stairs, front and rear third storey planter boxes, and front and rear third storey balconies. There will be a total of five residential dwelling units on this lot. · Issued (Permit Issued)
    • HVAC - Proposal to construct a new three-storey detached building with front and rear basement walkouts, front and rear ground floor porches with stairs, front and rear third storey planter boxes, and front and rear third storey balconies. There will be a total of five residential dwelling units on this lot. · Issued (Permit Issued)
    • Drain - Proposal to construct a new three-storey detached building with front and rear basement walkouts, front and rear ground floor porches with stairs, front and rear third storey planter boxes, and front and rear third storey balconies. There will be a total of five residential dwelling units on this lot. · Issued (Permit Issued)
    • Plumbing - Proposal to construct a new three-storey detached building with front and rear basement walkouts, front and rear ground floor porches with stairs, front and rear third storey planter boxes, and front and rear third storey balconies. There will be a total of five residential dwelling units on this lot. · Issued (Permit Issued)
    • HVAC - Proposal to construct a new three-storey detached building with front and rear basement walkouts, front and rear ground floor porches with stairs, front and rear third storey planter boxes, and front and rear third storey balconies. There will be a total of five residential dwelling units on this lot. · Issued (Permit Issued)
    • Drain - Proposal to construct a new three-storey detached building with front and rear basement walkouts, front and rear ground floor porches with stairs, front and rear third storey planter boxes, and front and rear third storey balconies. There will be a total of five residential dwelling units on this lot. · Issued (Permit Issued)
  • 26 Galbraith Ave

    • Proposal for a new 2 storey 2 Unit-Detached. · Issued (Permit Issued)
    • Drain - Proposal for a new 2 storey 2 Unit-Detached. · Issued (Permit Issued)
    • Plumbing - Proposal for a new 2 storey 2 Unit-Detached. · Issued (Permit Issued)
  • 22 Glenburn Ave

    • Plumbing - Proposal construct two storey addition, with integral garage. · Work under way (Inspection)
    • HVAC - Proposal construct two storey addition, with integral garage. · Work under way (Inspection)
  • 42 Glencrest Blvd

    • PROPOSED DEMOLISH EXISTING DETACHED SFD AND CONSTRUCT NEW 3 STORY SIX-PLEX INCLUDING TWO PORCHES AND FINISHED BASEMENT · Issued (Permit Issued)
    • PROPOSED DEMOLISH EXISTING DETACHED SFD AND CONSTRUCT NEW 3 STORY SIX-PLEX INCLUDING TWO PRCH AND FINISHED BASEMENT · Issued (Permit Issued)

Total over the last 12 months

O'Connor–Parkview
224
Average Toronto neighbourhood this size
about 204

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

0

July 2026 – September 2026

Total over the last 12 months

O'Connor–Parkview
0
Average Toronto neighbourhood this size
about 2
TapClick here to see the 6 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 4 July 2025 · Subdivision Approval · Under Review

    1450 O'connor Dr, 1500 O'connor Dr

    Draft Plan of Subdivision application to create two development blocks, a new public park block and a new public street. The application also seeks approval by the City of a request that part of the Subject Site be classified as a Class 4 Receptor Area pursuant to the Ministry of the Environments Noise Guideline NPC-300 to address noise from nearby industrial development. Please also see application # 25 187723 STE 19 OZ.

    Application 25 188183 STE 19 SB

    On the City’s site →

  • 3 June 2025 · OPA / Rezoning · Under Review

    793 O'connor Dr, 797 O'connor Dr

    Combined Official Plan Amendment and Zoning By-law Amendment applications to permit a 16-storey mixed-use building with a height of 55.5 metres (60.5 metres with the mechnical penthouse). The proposed development will contain 219 residential units and 290 square metres of non-residential GFA at grade. Two levels of underground parking are proposd with 54 vehicular space and 241 bicycle parking spaces.

    Application 25 170633 STE 19 OZ

    On the City’s site →

  • 20 May 2020 · Site Plan Approval · Under Review

    968 O'connor Dr

    INACTIVE The proposal contemplates the development of the subject site, which is currently vacant, with a 10-storey (31.05 metres, excluding mechanical penthouse) residential mixed-use building consisting of a 5-storey streetwall along O'Connor Drive and Curity Avenue and retail at grade. The proposed building will contain a total of 9,098 square metres of residential gross floor area including 126 residential units, and 383.0 square metres of non-residential gross floor area.

    Application 20 146692 STE 19 SA

    On the City’s site →

  • 11 July 2017 · Site Plan Approval · Under Review

    25 Waterman Ave

    INACTIVE Site Plan Approval to redevelop the subject lands with seven industrial condominium buildings, ranging in size from approximately 1,000 sq. m. to approximately 2,350 sq. m. In total, the proposal has a total gross floor area of 9,814.37 sq. metres.

    Application 17 196161 STE 31 SA

    On the City’s site →

  • 28 December 2016 · OPA / Rezoning · OMB Appeal

    49 Cranfield Rd

    Zoning By-law Amendment to permit the construction of a new 4-storey industrial building (13,403.0 square metres of non-residential gross floor area)

    Application 16 271211 STE 31 OZ

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district E03, which may cover a wider area than O'Connor–Parkview alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports