Property Snapshot

What is being built, applied for, and sold in Oakwood Village.

Home prices

The average across all homes sold in the district — not the price of any individual home.

average sale price

$2,290,894

August 2026 · 34 sales

$1.0M$1.5M$2.0M$2.5MAug 25Nov 25Feb 26May 26Aug 26

12-month average: $1,660,893.

Based on 34 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, July 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, July 2026
Home typeSalesAverage price
Detached23$2,457,969
Semi-Detached4$1,504,880
Att/Row/Townhouse1—
Condo Townhouse1—
Condo Apartment12$672,158

Att/Row/Townhouse: 1 sale; Condo Townhouse: 1 sale, too few to average.

No sales recorded in July 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

2026 so far, across 304 sales
$1,708,242

TRREB Market Watch, district C03, published 2026-09-03.

Average sale price by year

TRREB’s own average sale price by year, across the whole Toronto Regional Real Estate Board area — every district combined, not this neighbourhood alone.

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

Committee of Adjustment

Requests to build slightly outside the zoning rules, or to divide a lot. Each gets a public hearing.

hearings coming up

3

Updated daily · as of 24 September 2026

Decided in August 2026

1 — all approved

TapClick here to see the 3 hearings coming up

Every hearing scheduled as of 24 September 2026, in the order it will be heard. Descriptions are the City’s own words.

Wednesday 7 October

9:30 a.m. · Virtual Hearing / Committee Room 1, Second Floor, Toronto City Hall, 100 Queen St W, M5H 2N2

  • 408 Lauder Ave

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front one-storey addition (porch enclosure). Also, to construct a new one-storey ancillary building (shed), in the rear yard. The existing rear shed will be demolished.

    File A0490/26TEY

Wednesday 14 October

9:30 a.m. · Virtual Hearing / Committee Room 1, Second Floor, Toronto City Hall, 100 Queen St W, M5H 2N2

  • 52 Bude St

    To construct a new three-storey detached dwelling with a front integral garage, a front porch with stairs and a canopy, a rear basement walkout, and a rear first level deck.

    File A0572/26TEY

2:00 p.m. · Virtual Hearing / Committee Room 1, Second Floor, Toronto City Hall, 100 Queen St W, M5H 2N2

  • 386 Lauder Ave

    To alter the existing two-storey detached dwelling by enclosing a portion of the existing front porch into habitable space.

    File A0645/26TEY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-09-24.

Look up an application, or find out how to participate

Get next month’s edition

No apps to download. No password to remember. One email, one click, once a month.

Building permits

Permission to start work that already meets the rules. Most are small: a deck, a furnace, or a basement.

permits issued this month

30

August 2026

Total over the last 12 months

Oakwood Village
313
Average Toronto neighbourhood this size
about 237
TapClick here to see what the 30 permits were for

Every permit issued in August 2026, grouped by address. One property often has several — a new building carries its own plumbing, drain and mechanical permits. Descriptions are the City’s own words, and the status is where each permit stands now, not when it was issued — so work that has since finished reads “Closed”, and the stages are explained on the About the data page.

  • 77 Alameda Ave

    • Drain - Proposed greater than 50% demoltion for new construction of SFD detached with integral garage · Work under way (Inspection)
  • 42 Atlas Ave

    • Plumbing - Removing a load bearing wall on the main floor - single family dwelling · Work under way (Inspection)
  • 149 Atlas Ave

    • HVAC - Proposed interior alterations to an existing 2 storey semi detached dwelling. · Work under way (Inspection)
  • 560 Atlas Ave

    • HVAC - Demolition of existing house and construction of a new three storey sixplex · Issued (Permit Issued)
  • 25 Blandford St

    • Proposal to construct a 3 storey mulitplex (5 Units) with basement walkout and rear decks · Issued (Permit Issued)

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-09-08.

Apply for a building permit

Development applications

A request to build something the current rules don’t allow — a rezoning, or a variance.

applications in the latest quarter on record

0

May 2026 – July 2026

Total over the last 12 months

Oakwood Village
2
Average Toronto neighbourhood this size
about 3

City of Toronto Open Data — Development Applications, as of 2026-09-08. Refreshes automatically when the source publishes.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C03, which may cover a wider area than Oakwood Village alone.

The September 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports