Property Snapshot

What is being built, applied for, and sold in Mount Pleasant East.

Home prices

average sale price

$1,114,261

September 2026 · 54 sales

$600K$800K$1.0M$1.2MSep 25Dec 25Mar 26Jun 26Sep 26

12-month average: $1,006,375.

Based on 54 sales in September 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, September 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, September 2026
Home typeSalesAverage price
Detached10$1,884,350
Semi-Detached13$1,526,591
Att/Row/Townhouse1—
Condo Townhouse2—
Condo Apartment28$645,925

Att/Row/Townhouse: 1 sale; Condo Townhouse: 2 sales, too few to average.

No sales recorded in September 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district C10, published 2026-10-06.

Committee of Adjustment

hearings coming up

3

Updated daily · as of 22 November 2026

Decided in September 2026

4 — all approved

TapClick here to see the 3 hearings coming up

Every hearing scheduled as of 22 November 2026, in the order it will be heard. Descriptions are the City’s own words.

Thursday 26 November

10:00 a.m. · Virtual Hearing / Council Chamber, North York Civic Centre, 5100 Yonge Street, M2N 5V7

  • 12 Stibbard Ave

    To alter the existing two-storey detached dwelling by constructing a two-storey front and rear additions, and a new front porch and rear deck.

    File A0351/26NY

2:00 p.m. · Virtual Hearing / Council Chamber, North York Civic Centre, 5100 Yonge Street, M2N 5V7

  • 118 Forman Ave

    To construct a one-storey ancillary building (garden shed) in the rear yard of the property.

    File A0359/26NY

Thursday 10 December

10:00 a.m. · Virtual Hearing / Council Chamber, North York Civic Centre, 5100 Yonge Street, M2N 5V7

  • 52 Belcourt Rd

    To alter the existing one-storey detached dwelling by constructing second and third storey additions, a rear three-storey addition and a new rear deck, in conjunction with interior alterations including a new integral garage.

    File A0365/26NY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-11-22.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

34

September 2026

TapClick here to see what the 34 permits were for
  • 61 Banff Rd

    • Plumbing - Proposal to construct a ground floor addition and a second storey addition, front porch, rear deck and basement walk up. · Issued (Permit Issued)
  • 1560 Bayview Ave

    • HVAC - Interior alterations to convert an existing commercial unit into a hair salon. · Issued (Permit Issued)
    • Interior alterations to convert an existing commercial unit into a hair salon. · Issued (Permit Issued)
    • Plumbing - Interior alterations to convert an existing commercial unit into a hair salon. · Issued (Permit Issued)
  • 52 Belcourt Rd

    • Drain - Proposed underpinning to existing single family dwelling. · Issued (Permit Issued)
    • Plumbing - Proposed underpinning to existing single family dwelling. · Issued (Permit Issued)
    • Proposed underpinning to existing single family dwelling. · Issued (Permit Issued)
  • 20 Belle Ayre Blvd

    • Installation of Main Drain Pipe "Backwater Valve" · Closed (Closed)
  • 192 Belsize Dr

    • Plumbing - Proposal to lower basement by underpinning (22 linear metres). Finish basement. Interior alteratiosn on first and second floors. · Issued (Permit Issued)
    • Drain - Proposal to lower basement by underpinning (22 linear metres). Finish basement. Interior alteratiosn on first and second floors. · Issued (Permit Issued)
    • Proposal to lower basement by underpinning (22 linear metres). Finish basement. Interior alteratiosn on first and second floors. · Work under way (Inspection)

Total over the last 12 months

Mount Pleasant East
335
Average Toronto neighbourhood this size
about 196

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

0

July 2026 – September 2026

Total over the last 12 months

Mount Pleasant East
2
Average Toronto neighbourhood this size
about 2
TapClick here to see the 16 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 15 June 2026 · OPA / Rezoning · Under Review

    525 Eglinton Ave E

    Proposed 45-storey mixed-use building containing 526 total dwelling units. The proposal contains a total gross floor area (GFA) of 34,991 m², comprised of 34,665 m² of residential GFA and 326 m² of non-residential GFA at grade.

    Application 26 184500 NNY 15 OZ

    On the City’s site →

  • 23 July 2025 · OPA / Rezoning · OMB Appeal

    544 Eglinton Ave E, 546-548 Eglinton Ave E, 550 Eglinton Ave E and 2 more addresses

    OPA & Rezoning Application proposes the development of an 25-storey mixed-use building providing commercial use at grade. The building will provide a total of 256 residential units, with a mix of studio, 1-bedroom, 2-bedroom, and 3-bedroom units.A paved access from Bruce Ave will be provided, leading to 2 levels of below-grade parking, providing a total of 58 parking spaces; as well as 283 bicycle parking spaces. The proposed development provides a total GFA of 19,801.40 square metres and a FSI of 11.96. Additionally, the proposed development provides 739.10 square metres of indoor amenity space and 305.50 square metres of outdoor amenity space.

    Application 25 198600 NNY 15 OZ

    On the City’s site →

  • 3 July 2025 · OPA / Rezoning · OMB Appeal

    299 Roehampton Ave, 305 Roehampton Ave

    Redevelopment of 299 Roehampton Avenue with a new purpose-built rental apartment building with a shared 10-storey (33.3 metres) podium element and two towers with a total building height of 59-storeys (189.2 metres, inclusive of 7.0-metre mechanical penthouses). The proposal provides a total gross floor area (GFA) of 101,725 square metres, and 1,519 residential units (218 of which will be rental replacement units). The proposal would retain the existing rental apartment buildings at 305 Roehampton Avenue and 322 Eglinton Avenue East.

    Application 25 187440 NNY 15 OZ

    On the City’s site →

  • 6 February 2025 · OPA / Rezoning · OMB Appeal

    609 Roehampton Ave

    Rezoning application proposing to redevelop the Subject Lands with two residential apartment buildings containing building heights of 15 storey's each (plus Mechanical Penthouse) with a total floor space index of 7.31. In total, the Proposal will contain a GFA of approximately 15,285.1 sq. m. This provides for a proposed residential unit count of 209 apartment dwellings.

    Application 25 113541 NNY 15 OZ

    On the City’s site →

  • 4 September 2024 · Site Plan Approval · Under Review

    19 Glenavy Ave, 21 Glenavy Ave, 23 Glenavy Ave and 4 more addresses

    Application 24 208067 NNY 15 SA

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C10, which may cover a wider area than Mount Pleasant East alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports