Property Snapshot

What is being built, applied for, and sold in Moss Park.

Home prices

The average across all homes sold in the district — not the price of any individual home.

average sale price

$692,887

August 2026 · 135 sales

$600K$700K$800K$900KAug 25Nov 25Feb 26May 26Aug 26

12-month average: $704,048.

Based on 135 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, July 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, July 2026
Home typeSalesAverage price
Detached1—
Semi-Detached3$1,170,000
Att/Row/Townhouse12$1,084,000
Condo Townhouse4$1,382,500
Condo Apartment138$652,330

Detached: 1 sale, too few to average.

No sales recorded in July 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

January – August 2026, across 1,103 sales
$685,957

TRREB Market Watch, district C08, published 2026-09-03. Updated when TRREB publishes the next Market Watch.

Average sale price by year

TRREB’s own average sale price by year, across the whole Toronto Regional Real Estate Board area — every district combined, not this neighbourhood alone.

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

Committee of Adjustment

Requests to build slightly outside the zoning rules, or to divide a lot. Each gets a public hearing.

hearings coming up

2

Updated daily · as of 6 October 2026

Decided in September 2026

4 — all approved

TapClick here to see the 2 hearings coming up

Every hearing scheduled as of 6 October 2026, in the order it will be heard. Descriptions are the City’s own words.

Wednesday 14 October

2:00 p.m. · Virtual Hearing / Committee Room 1, Second Floor, Toronto City Hall, 100 Queen St W, M5H 2N2

  • 185 Gerrard St E

    To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.

    File A0633/26TEY

TBA · TBA

  • 125 George St

    To obtain consent to create a new stratified easement/right-of-way.

    File B0043/26TEY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-06.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

Permission to start work that already meets the rules. Most are small: a deck, a furnace, or a basement.

permits issued this month

10

September 2026

Total over the last 12 months

Moss Park
176
Average Toronto neighbourhood this size
about 363
TapClick here to see what the 10 permits were for

Every permit issued in September 2026, grouped by address. One property often has several — a new building carries its own plumbing, drain and mechanical permits. Descriptions are the City’s own words, and the status is where each permit stands now, not when it was issued — so work that has since finished reads “Closed”, and the stages are explained on the About the data page.

  • 310 Dundas St E

    • HVAC - Proposal for interior alterations - including finishes, accessibity upgrades, replacement of exterior doors and mechanical system upgrades · Issued (Permit Issued)
    • Proposal for interior alterations to retail unit (alterations to interior finishes, accessibity upgrades, replacement of exterior doors and mechanical system upgrades). · Issued (Permit Issued)
    • Plumbing - Proposal for interior alterations - including finishes, accessibity upgrades, replacement of exterior doors and mechanical system upgrades · Issued (Permit Issued)
  • 159 Frederick St

    • Proposal for design of maglock system on ground floor. · Issued (Permit Issued)
  • 257 Jarvis St

    • Balcony Remedial work - Isolated conc. repair and brick masonry repair, Installation of new waterproofing system, Replace existing balcony guardrail with new.Convenience address is 279 Jarvis St · Issued (Permit Issued)
  • 171 King St E

    • Proposal to remove a load bearing wall and replacing it with a steel beam. · Issued (Permit Issued)
  • 280 King St E

    • Proposal to install 1 single maglock 4th floor · Closed (Closed)

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-06.

Apply for a building permit

Development applications

A request to build something the current rules don’t allow — a rezoning, or a variance.

applications in the latest quarter on record

0

June 2026 – August 2026

Total over the last 12 months

Moss Park
10
Average Toronto neighbourhood this size
about 4
TapClick here to see the 36 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 26 May 2026 · Condominium Approval · Under Review

    125 George St, 231 Richmond St E

    Draft Plan of Condominium for 39-storey mixed-use development with four levels of underground parking, and containing 516 residential dwelling units.

    Application 26 167726 STE 13 CD

    On the City’s site →

  • 26 May 2026 · Site Plan Approval · Under Review

    306 Gerrard St E, 308 Gerrard St E

    Site Plan Approval for an 11-storey mixed-use building containing 228 market and affordable residential units, plus office and community program space.

    Application 26 167772 STE 13 SA

    On the City’s site →

  • 9 March 2026 · Site Plan Approval · Application Received

    405 Sherbourne St

    Site Plan Control Application for a 35-storey (112.6) metre building (excluding mechanical penthouse) 25,069 square metres of residential gross floor area and 388 square metres of non-residential gross floor area and a landscaped mid-block connection between Sherbourne and Bleecker Streets.

    Application 26 126970 STE 13 SA

    On the City’s site →

  • 15 October 2025 · OPA / Rezoning · Under Review

    349 George St, 309 George St, 311 George St and 6 more addresses

    Lift the Hold application related to a new 10-storey building, containing 80 emergency shelter beds, 100 transitional shelter beds, 124 long-term care beds, 70 supportive housing units, and a 2,269 square metre community hub. The proposal would replace the existing Seaton House men's shelter. For more information about the proposal, go to: www.toronto.ca/george-street-revitalization

    Application 25 239940 STE 13 OZ

    On the City’s site →

  • 4 July 2025 · Site Plan Approval · Under Review

    213 Gerrard St E, 219 Gerrard St E, 211 Gerrard St E

    Site Plan Approval for a 10-storey mixed use building with 60 purpose-built rental units and commercial uses at grade.

    Application 25 187962 STE 13 SA

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-06. Refreshes automatically when the source publishes.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C08, which may cover a wider area than Moss Park alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports