March 2026 edition
Property Snapshot
What is being built, applied for, and sold in Rosedale–Moore Park.
Great neighbourhoods don’t happen by accident. Members stay informed. Join the Moore Park Residents Association
Building permits
permits issued this month
35
March 2026
TapClick here to see what the 35 permits were forHide the 35 permits
29 Alvin Ave
- HVAC - Proposed interior alterations and the addition of a new bathroom and laundry room on the second floor. · Closed (Closed)
40 Asquith Ave
- HVAC - Proposal for in-suite accessibility modifications to achieve a barrier-free dwelling unit, including alterations to the washroom and kitchen. · Work under way (Inspection)
- Plumbing - Proposal for in-suite accessibility modifications to achieve a barrier-free dwelling unit, including alterations to the washroom and kitchen. · Work under way (Inspection)
96 Asquith Ave
- Proposal for shed in rear yard. · Work under way (Inspection)
20 Avoca Ave
- Proposal for in-suite fan coil & riser replacement for several units (see attached list) in an existing apartment building. · Issued (Permit Issued)
2 Bloor St E
- Plumbing - Proposal for interior alterations including demolition of interior partitions. · Closed (Closed)
Total over the last 12 months
- Rosedale–Moore Park
- 446
- Average Toronto neighbourhood this size
- about 280
City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.
Development applications
applications this quarter
2
January 2026 – March 2026
Total over the last 12 months
- Rosedale–Moore Park
- 5
- Average Toronto neighbourhood this size
- about 3
TapClick here to see the 19 open applications Hide the 19 open applications
Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.
16 June 2026 · Site Plan Approval · Under Review
1 Heath St E, 1497 Yonge St, 1501 Yonge St and 9 more addresses
Mixed use development consisting of three towers organized around a central publicly accessible open space (POPS), along with a new 1,560 m² public park at the northwest corner of the site. The development would include 661 residential units, approximately 15,627 m² of retail, restaurant, wellness and other non-residential uses, and a network of mid-block pedestrian connections, including a direct connection to St. Clair Subway Station. The proposal also incorporates a shared podium for Towers 1 and 2, a standalone Tower 3 connected by an enclosed bridge, and below-grade vehicular, loading and servicing facilities to support a pedestrian-focused public realm.
Application 26 185667 STE 12 SA
22 April 2026 · OPA / Rezoning · Under Review
2 Bloor St E, 90 Bloor St E, 80 Bloor St E
Zoning By-law Amendment to permit a self-storage warehouse use on floors 2-5 (formely The Bay retail space). The existing ground floor retail unit will be maintained. Access for loading and parking will be from Asquith Avenue. No new development is proposed on site.
Application 26 148240 STE 11 OZ
12 August 2025 · OPA / Rezoning · OMB Appeal
38 Park Rd, 50 Park Rd, 40 Park Rd
Proposed 31-storey (107.9 metres) purpose-built rental building and the restoration and adaptive reuse of the heritage building at 50 Park Road, which is proposed to be integrated into the new development. The proposed development includes 289 purpose-built dwelling units, inclusive of 40 rental replacement units and 249 new market rental dwelling units.
Application 25 209063 STE 11 OZ
28 May 2025 · OPA / Rezoning · Under Review
9 Price St, 1091 Yonge St, 1087 Yonge St
Official Plan and Zoning By-law Amendment application to permit a 35-storey mixed-use building, containing 235 dwelling units and 1,645 square metres of non-residential gross floor area.
Application 25 166443 STE 11 OZ
6 July 2022 · Site Plan Approval · Under Review
350 Bloor St E
Proposal to construct a 63-storey mixed-use building on the subject site. The existing six-storey office building will be replaced. Approximately 486 square metres of retail is proposed at grade, with approximately 8,259 square metres of office space proposed on floors one to seven, and approximately 39,356 square metres of residential gross floor area proposed on floors seven to 63. The proposed building will include approximately 675 new dwelling units (in a mix of studio, one-bedroom, two-bedroom, and three-bedroom units) and will provide 74 vehicular parking spaces and 713 bicycle parking spaces underground.
Application 22 172659 STE 11 SA
City of Toronto Open Data — Development Applications, as of 2026-10-11.
Get next month’s edition
No app, no download, no password. Just one email, once a month.
Know a neighbour who’d want this?
It’s free, and there’s a new one every month.
How to read this
Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.
An application is a request, not an approval. Sale prices cover TRREB district C09, which includes Rosedale and so is wider than Moore Park alone.
The March 2026 safety report covers publicly reported police data for the same month.
Looking for another neighbourhood?
Nothing is sent anywhere — this check runs in your browser.