Property Snapshot

What is being built, applied for, and sold in Lawrence Park North.

Home prices

average sale price

$2,176,506

September 2026 · 54 sales

$1.5M$2.0M$2.5M$3.0MSep 25Dec 25Mar 26Jun 26Sep 26

12-month average: $2,036,895.

Based on 54 sales in September 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, September 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, September 2026
Home typeSalesAverage price
Detached37$2,650,889
Semi-Detached3$1,633,333
Condo Townhouse1—
Condo Apartment13$1,007,571

Condo Townhouse: 1 sale, too few to average.

No sales recorded in September 2026: Att/Row/Townhouse, Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district C04, published 2026-10-06.

Committee of Adjustment

hearings coming up

2

Updated daily · as of 22 November 2026

TapClick here to see the 2 hearings coming up

Every hearing scheduled as of 22 November 2026, in the order it will be heard. Descriptions are the City’s own words.

Thursday 10 December

10:00 a.m. · Virtual Hearing / Council Chamber, North York Civic Centre, 5100 Yonge Street, M2N 5V7

  • 39 Old Orchard Grv · Tentative date

    To alter the existing driveway and front yard landscaping.

    File A0366/26NY

  • 166 Woburn Ave · Tentative date

    To construct a new three-storey detached duplex and a two-storey ancillary building in the rear yard, containing a laneway suite with an integral garage.

    File A0372/26NY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-11-22.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

19

September 2026

TapClick here to see what the 19 permits were for
  • 297 Brookdale Ave

    • Proposed rear one-storey addition to an existing single family semi-detached dwelling, with a new rear deck, and interior alterations to ground floor. Also, to remove the rear ancillary building (garage) and propose a new parking space in the rear yard. · Work under way (Inspection)
    • Plumbing - Remove load bearing walls on 1st floor. Relocate existing kitchen. New rear 1 sty additionwith crawlspace below. New rear 2st floor deck. Demolish existing wood frame semi-detached garage. · Issued (Permit Issued)
    • Drain - Remove load bearing walls on 1st floor. Relocate existing kitchen. New rear 1 sty additionwith crawlspace below. New rear 2st floor deck. Demolish existing wood frame semi-detached garage. · Issued (Permit Issued)
  • 306 Cranbrooke Ave

    • Proposal to replace front porch with an enclosed one storey mudroom addition. · Work under way (Inspection)
  • 129 Deloraine Ave

    • HVAC - · Issued (Permit Issued)
  • 239 Deloraine Ave

    • install a back water valve · Closed (Closed)
  • 156 Fairlawn Ave

    • Proposed basement walkout and the opening of a new exterior door in the foundation wall. · Issued (Permit Issued)

Total over the last 12 months

Lawrence Park North
304
Average Toronto neighbourhood this size
about 149

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

0

July 2026 – September 2026

Total over the last 12 months

Lawrence Park North
0
Average Toronto neighbourhood this size
about 2
TapClick here to see the 1 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 29 October 2021 · Condominium Approval · Under Review

    3180-3182 Yonge St, 3202 Yonge St, 3200 Yonge St and 9 more addresses

    *** Draft Plan of Condominium for 109 units.

    Application 21 231950 NNY 08 CD

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C04, which may cover a wider area than Lawrence Park North alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports