Property Snapshot

What is being built, applied for, and sold in Lansing–Westgate.

Home prices

The average across all homes sold in the district — not the price of any individual home.

average sale price

$1,107,287

August 2026 · 59 sales

$800K$900K$1.0M$1.1M$1.2MAug 25Nov 25Feb 26May 26Aug 26

12-month average: $1,032,747.

Based on 59 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, July 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, July 2026
Home typeSalesAverage price
Detached21$1,618,303
Semi-Detached5$873,800
Condo Townhouse5$674,000
Condo Apartment38$642,468

No sales recorded in July 2026: Att/Row/Townhouse, Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

January – August 2026, across 467 sales
$1,025,093

TRREB Market Watch, district C07, published 2026-09-03. Updated when TRREB publishes the next Market Watch.

Average sale price by year

TRREB’s own average sale price by year, across the whole Toronto Regional Real Estate Board area — every district combined, not this neighbourhood alone.

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

Committee of Adjustment

Requests to build slightly outside the zoning rules, or to divide a lot. Each gets a public hearing.

hearings coming up

3

Updated daily · as of 6 October 2026

Decided in September 2026

1 — all approved

TapClick here to see the 3 hearings coming up

Every hearing scheduled as of 6 October 2026, in the order it will be heard. Descriptions are the City’s own words.

Thursday 15 October

10:00 a.m. · Virtual Hearing / Members' Lounge, Lower Level, North York Civic Centre, 5100 Yonge Street, M2N 5V7

  • 105 Poyntz Ave

    To construct a new two storey detached dwelling. File B0012/26NY, A0168/26NY and A0169/26NY will be jointly considered.

    File A0168/26NY

  • 105 Poyntz Ave

    To construct a new two storey detached dwelling. File B0012/26NY, A0168/26NY and A0169/26NY will be jointly considered.

    File A0169/26NY

  • 105 Poyntz Ave

    To obtain consent to sever the property into two undersized residential lots. Files B0012/26NY, A0168/26NY and A0169/26NY will be jointly considered.

    File B0012/26NY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-06.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

Permission to start work that already meets the rules. Most are small: a deck, a furnace, or a basement.

permits issued this month

23

September 2026

Total over the last 12 months

Lansing–Westgate
230
Average Toronto neighbourhood this size
about 179
TapClick here to see what the 23 permits were for

Every permit issued in September 2026, grouped by address. One property often has several — a new building carries its own plumbing, drain and mechanical permits. Descriptions are the City’s own words, and the status is where each permit stands now, not when it was issued — so work that has since finished reads “Closed”, and the stages are explained on the About the data page.

  • 240 Armour Blvd

    • PROP. SECOND STOREY REAR BALCONY (10.39M2) · Issued (Permit Issued)
  • 328 Burnett Ave

    • Proposed partial second floor addition · Issued (Permit Issued)
    • Plumbing - Proposed partial second floor addition · Issued (Permit Issued)
  • 51 Cameron Ave

    • Proposal to demolish existing house and construct a new three-storey detached dwelling with attached garage on existing east lot (Part 2) · Issued (Permit Issued)
    • Proposal to demolish existing house and construct a new three-storey detached dwelling with attached garage on existing west lot Part 1 · Issued (Permit Issued)
    • Drain - Proposal to demolish existing house and construct a new two-storey detached dwelling with attached garage on existing west lot Part 1 · Issued (Permit Issued)
    • Plumbing - Proposal to demolish existing house and construct a new two-storey detached dwelling with attached garage on existing east lot (Part 2) · Issued (Permit Issued)
    • Drain - Proposal to demolish existing house and construct a new two-storey detached dwelling with attached garage on existing east lot (Part 2) · Issued (Permit Issued)
    • DEMOLISH EXISTING DWELLING, BUILD NEW 3 STOREY HOUSE WITH ATTACHED GARAGE ON EXISTING EAST LOT (110). · Issued (Permit Issued)
    • Plumbing - Proposal to demolish existing house and construct a new two-storey detached dwelling with attached garage on existing west lot Part 1 · Issued (Permit Issued)
  • 9 Lyonsgate Dr

    • Plumbing - MINOR INTERIOR ALTERATIONS IN AN EXISTING DWELLING · Work under way (Inspection)
  • 25 Sheppard Ave W

    • HVAC - Proposed interior alterations including demolition of interior partitions and construction of new. · Issued (Permit Issued)
    • Proposed interior alterations including demolition of interior partitions and construction of new. · Issued (Permit Issued)
    • Plumbing - Proposed interior alterations including demolition of interior partitions and construction of new. · Issued (Permit Issued)

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-06.

Apply for a building permit

Development applications

A request to build something the current rules don’t allow — a rezoning, or a variance.

applications in the latest quarter on record

2

June 2026 – August 2026

Total over the last 12 months

Lansing–Westgate
7
Average Toronto neighbourhood this size
about 2
TapClick here to see the 22 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 23 July 2026 · Site Plan Approval · Under Review

    5100 Yonge St

    City of Markham application - To demolish the existing automobile service station and reconstruct a new automobile services station, and construct a car wash and drive-through restaurant on the subject site.

    Application 26 207610 NNY 18 SA

    On the City’s site →

  • 14 July 2026 · OPA / Rezoning · Under Review

    5100 Yonge St

    City of Markham File - Commenting Partner Only - Rezoning Application: Proposal for a residential development with seven rear-lane townhouse units, 14 resident parking and 2 visitor parking spaces.

    Application 26 201951 NNY 18 OZ

  • 19 May 2026 · Site Plan Approval · Under Review

    68 Sheppard Ave W

    Site Plan Control application proposes a 6 storey (17.9m) emergency shelter - mix of sleeping areas and amenity spaces with 1 loading space.

    Application 26 162744 NNY 18 SA

    On the City’s site →

  • 5 March 2026 · Site Plan Approval · Application Received

    5100 Yonge St

    City of Vaughan Site Plan Application (7080 Yonge Street) for a 12-storey and 44-storey residential building.

    Application 26 125368 NNY 18 SA

  • 6 February 2026 · OPA / Rezoning · Under Review

    17 Johnston Ave, 21 Johnston Ave, 11 Johnston Ave

    OPA & Rezoning Application proposes the development of a 48-storey mixed-use building providing residential and commercial use at grade. The building will provide a total of 479 residential units, being a mix of 1-bedroom, 2-bedroom, and 3-bedroom units. The building will also provide retail at grade. A paved access from Johston Ave along the east property line will be provided, leading to 2 levels of below-grade parking, providing a total of 51 parking spaces; as well as 208 bicycle parking spaces. The proposed development provides a total GFA of 37,521.90 square metres and a FSI of 20.80. Additionally, the proposed development provides 1,050.90 square metres of indoor amenity space and 525.90 square metres of outdoor amenity space.

    Application 26 114386 NNY 18 OZ

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-06. Refreshes automatically when the source publishes.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C07, which may cover a wider area than Lansing–Westgate alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports