Property Snapshot

What is being built, applied for, and sold in Kensington–Chinatown.

Home prices

average sale price

$778,870

August 2026 · 231 sales

$750K$800K$850K$900KAug 25Nov 25Feb 26May 26Aug 26

12-month average: $815,975.

Based on 231 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, August 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, August 2026
Home typeSalesAverage price
Detached3$2,373,000
Semi-Detached12$1,519,667
Att/Row/Townhouse4$1,660,750
Condo Townhouse8$754,038
Condo Apartment204$695,533

No sales recorded in August 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district C01, published 2026-09-03.

Committee of Adjustment

hearings coming up

1

Updated daily · as of 11 October 2026

Decided in August 2026

1 — all approved

TapClick here to see the 1 hearings coming up

Every hearing scheduled as of 11 October 2026, in the order it will be heard. Descriptions are the City’s own words.

Wednesday 4 November

9:30 a.m. · Virtual Hearing / Committee Room 1, Second Floor, Toronto City Hall, 100 Queen St W, M5H 2N2

  • 42 Carr St · Tentative date

    To construct a new four-storey detached building (houseplex) with a front entrance with stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a corner (northwest) covered balcony located on the second storey, and a rear third floor rooftop patio. There will be three vehicular visitor parking space in the rear yard. There will be a total of six residential dwelling units on this lot.

    File A0667/26TEY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-11.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

32

August 2026

TapClick here to see what the 32 permits were for
  • 221 Beverley St

    • Proposed interior layout modification and 3 storey addition/extension at rear yard. --Party Wall Admin Permits- 2026 216781 BLD 00 SR · Work under way (Inspection)
    • Plumbing - Proposed interior layout modification and 3 storey addition/extension at rear yard. · Issued (Permit Issued)
    • Drain - Proposed interior layout modification and 3 storey addition/extension at rear yard. · Issued (Permit Issued)
  • 223 Beverley St

    • Admin party wall permit for proposed work at 221 Beverley Street - 2026 21533 BLD 00 SR · Issued (Permit Issued)
  • 42 Carr St

    • Demolition of existing one storey house, shed, and garage. Construction of new three storey sixplex. · Issued (Permit Issued)
  • 350 Dundas St W

    • HVAC - Proposal for multiple projects (interior alterations and railing replacement). · Work under way (Inspection)
    • Proposal for multiple projects (interior alterations and railing replacement). · Issued (Permit Issued)
    • Plumbing - Proposal for multiple projects (interior alterations and railing replacement). · Issued (Permit Issued)
  • 571 Dundas St W

    • Site Services in connection to 2 new TCHC townhome blocks (BLOCK 5 - 61-79 PAUL LANE GARDENS and BLOCK 6 - 31A-49 AUGUSTA AVE). · Issued (Permit Issued)

Total over the last 12 months

Kensington–Chinatown
357
Average Toronto neighbourhood this size
about 262

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

2

June 2026 – August 2026

Total over the last 12 months

Kensington–Chinatown
6
Average Toronto neighbourhood this size
about 3
TapClick here to see the 10 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 18 August 2026 · OPA / Rezoning · Under Review

    180 Simcoe St, 180 Queen St W, 190 Simcoe St and 3 more addresses

    Proposed development for the Canada Life Campus include: Retention of the existing office buildings with minor alterations at 330 University Avenue, 180 Simcoe Street, and 180 Queen Street West. Demolition of the office building and parking structure at 190 and 206 Simcoe Street. Construction of a 71-storey residential tower on the private open space to the north of the Canada Life Building (Tower A); Construction of two residential towers of 54 storeys (Tower B) and 25 storeys (Tower C) integrated with a multi-use podium element (West Block); Construction of a six-storey Amenity Pavilion to the east of 180 Simcoe Street. Overall, the proposed development includes 64,103 square metres of retained office space, 10,476 of new commercial space, and 114,383 square metres of residential space for 1,402 dwelling units.

    Application 26 221979 STE 10 OZ

    On the City’s site →

  • 22 July 2026 · OPA / Rezoning · Under Review

    309 Augusta Ave

    Proposed six storey hotel with restaurant components containing 2194sqm of non-residential gross floor area. No parking is proposed.

    Application 26 206718 STE 11 OZ

    On the City’s site →

  • 5 December 2025 · OPA / Rezoning · Under Review

    50 Stephanie St

    Combined Official Plan & Zoning By-law Amendment for an 11-storey purpose-built rental residential building atop a 3-storey podium. The proposed development contains a total gross floor area of 11,198 square metres, with a total number of 163 dwelling units. The proposed building is connected to the existing 24-storey rental apartment building through a 1-storey podium element. Together with the existing building, the proposal will result in a combined unit count of 444 rental residential units. The Official Plan Amendment is required to redesignate the lands from Neighbourhoods to Apartment Neighbourhoods.

    Application 25 262812 STE 10 OZ

    On the City’s site →

  • 28 August 2022 · Site Plan Approval · Under Review

    195 College St, 193 College St, 197 College St and 4 more addresses

    Related App 22 150580 STE 11 OZSite Plan application for proposal for a 31-storey mixed-use building containing 492 purpose-built rental units. The proposed non-residential gross floor area is 1,379 square metres, and the proposed residential gross floor area is 19,924 square metres.

    Application 22 196930 STE 11 SA

    On the City’s site →

  • 17 August 2022 · Site Plan Approval · Under Review

    522 University Ave

    Site Plan Control application to permit a 64-storey mixed-use building, comprised of a 51-storey residential tower atop a 15-storey office podium. The proposal consists of a total of approximately 54,983 square metres of gross floor area, of which 33,570 square metres would be dedicated to residential uses, 21,202 square metres to office uses, and 2111 square metres to retail uses, resulting in a density of 22.8 FSI. The proposed building will contain a total of 579 dwelling units in a range of unit types.

    Application 22 192155 STE 11 SA

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C01, which may cover a wider area than Kensington–Chinatown alone.

The September 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports