October 2026 edition
Property Snapshot
What is being built, applied for, and sold in Humber Summit.
Home prices
average sale price
$743,631
September 2026 · 67 sales
12-month average: $779,572.
| Month | Average sale price |
|---|---|
| Sep 2025 | $790,023 |
| Oct 2025 | $843,175 |
| Nov 2025 | $773,746 |
| Dec 2025 | $804,787 |
| Jan 2026 | $723,163 |
| Feb 2026 | $715,150 |
| Mar 2026 | $721,865 |
| Apr 2026 | $789,210 |
| May 2026 | $820,131 |
| Jun 2026 | $832,113 |
| Jul 2026 | $790,781 |
| Aug 2026 | $701,795 |
| Sep 2026 | $743,631 |
Based on 67 sales in September 2026.
TapClick to see what your type of home is selling forHide the home types
Sales and average price by major home type, September 2026 — the latest Market Watch issue that carries this breakdown.
| Home type | Sales | Average price |
|---|---|---|
| Detached | 15 | $975,177 |
| Semi-Detached | 24 | $844,000 |
| Att/Row/Townhouse | 6 | $842,433 |
| Condo Townhouse | 6 | $578,333 |
| Condo Apartment | 16 | $400,938 |
No sales recorded in September 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.
Toronto region: average sale price by year since 2013
| Month | Average sale price |
|---|---|
| 2013 | $525,681 |
| 2014 | $569,402 |
| 2015 | $623,529 |
| 2016 | $731,927 |
| 2017 | $823,422 |
| 2018 | $784,118 |
| 2019 | $812,989 |
| 2020 | $926,340 |
| 2021 | $1,098,088 |
| 2022 | $1,193,766 |
| 2023 | $1,131,219 |
| 2024 | $1,120,241 |
TRREB Market Watch, historic annual statistics.
TRREB Market Watch, district W05, published 2026-10-06.
Committee of Adjustment
hearings coming up
None scheduled
Updated daily · as of 22 November 2026
City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-11-22.
Get next month’s edition
No app, no download, no password. Just one email, once a month.
Building permits
permits issued this month
10
September 2026
TapClick here to see what the 10 permits were forHide the 10 permits
67 Cherrylawn Ave
- HVAC - Proposed one-story Garden Suite · Issued (Permit Issued)
- Proposed one-story Garden Suite · Work under way (Inspection)
50 Emily Ave
- Plumbing - Proposed new four-unit detached dwelling. · Issued (Permit Issued)
- HVAC - Proposed new four-unit detached dwelling. · Issued (Permit Issued)
100 Rowntree Mill Rd
- INSTALL BWV AND SUMP PUMP · Closed (Closed)
78 Seacliff Blvd
- Fire Damage - Restore the building to its pre-loss condition. Work includes replacing damaged roof structural members within the lower attic with engineered trusses, replacing damaged wall studs, gable wall framing, header beams, and top plates, and restoring all affected structural elements. Damaged doors and windows will be removed and replaced with comparable units. Additionally, all damaged interior finishes, including wall, ceiling, and floor materials, will be fully removed and replaced to match existing conditions and finishes present before the loss. · Issued (Permit Issued)
150 Signet Dr
- Proposed new spray dryer · Issued (Permit Issued)
Total over the last 12 months
- Humber Summit
- 120
- Average Toronto neighbourhood this size
- about 107
City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.
Development applications
applications this quarter
2
July 2026 – September 2026
Total over the last 12 months
- Humber Summit
- 5
- Average Toronto neighbourhood this size
- about 1
TapClick here to see the 12 open applications Hide the 12 open applications
Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.
10 August 2026 · Part Lot Control Exemption · Under Review
111 Plunkett Rd
Part Lot Control Application for 12 lots.
Application 26 216691 WET 07 PL
10 July 2026 · OPA / Rezoning · Under Review
2424 Finch Ave W
The Official Plan and Zoning By-law Amendment would facilitate redevelopment of a site that is designated as 'General Employment Areas' on Map 13 of the City of Toronto's Official Plan and zoned Employment Heavy Industrial (EH 1.0) and Industrial-Commercial (MC) under the former North York Zoning By-law 7625, where residential uses are not permitted. The proposal contemplates a new community consisting of nine (9) new mixed-use buildings ranging in height from 30 to 45 storeys. The proposal includes 4,456 residential dwelling units, 269,573 square metres of residential gross floor area (GFA), 1,604 square metres of retail GFA, and 9,134 square metres of residential amenity space. The proposal includes a new public street right-of-way with two new intersections located on Finch Avenue West and Milvan Drive. The proposal includes a new 3,267 square metre public park located on the northeast portion of the site, with frontage onto the new public street and the natural feature/natural hazard lands associated with Emery Creek.
Application 26 199787 WET 07 OZ
12 March 2026 · Site Plan Approval · Under Review
139 Millwick Dr
The proposed development involves a ground floor addition at the rear of the existing place of worship building, along with interior alterations.
Application 26 128711 WET 07 SA
6 February 2026 · OPA / Rezoning · Under Review
2450 Finch Ave W
Official Plan and Zoning By-Law Amendment application that proposes to redesignate the subject site from "Regeneration Areas" to "Mixed Use Areas", and permit two mixed-use buildings with heights of 44 storeys (Building A), and 47 storeys (Building B), inclusive of independent 6-storey podiums for each building. The existing one-storey commercial building on the subject site is not proposed to be retained. The proposed buildings would have a total gross-floor-area (GFA) of approximately 75,165 square metres, comprised of 68,760 square metres of residential GFA and 6,405 square metres of non-residential GFA. The residential component proposes 1,136 dwelling units. The proposed non-residential component includes a mix of childcare space, a grocery store, and retail and service commercial space. One level of underground parking is proposed that would be shared between Building A and Building B with 220 vehicle parking spaces. The application also proposes 993 square metres of parkland dedication, located at the southwest corner of the subject site. Independent of the proposed parkland dedication area is a proposed 10-metre natural buffer area along the entirety of the west lot line, adjacent to Duncanwoods Greenbelt.
Application 26 114412 WET 07 OZ
13 January 2026 · Site Plan Approval · Under Review
700 Fenmar Dr, 770 Fenmar Dr
Proposed addition to existing manufacturing facility.
Application 26 104032 WET 07 SA
City of Toronto Open Data — Development Applications, as of 2026-10-11.
Know a neighbour who’d want this?
It’s free, and there’s a new one every month.
How to read this
Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.
An application is a request, not an approval. Sale prices cover TRREB district W05, which may cover a wider area than Humber Summit alone.
The October 2026 safety report covers what was reported to police. Each figure names the period it covers.
Looking for another neighbourhood?
Nothing is sent anywhere — this check runs in your browser.