Property Snapshot

What is being built, applied for, and sold in Harbourfront–CityPlace.

Home prices

average sale price

$778,870

August 2026 · 231 sales

$750K$800K$850K$900KAug 25Nov 25Feb 26May 26Aug 26

12-month average: $815,975.

Based on 231 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, August 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, August 2026
Home typeSalesAverage price
Detached3$2,373,000
Semi-Detached12$1,519,667
Att/Row/Townhouse4$1,660,750
Condo Townhouse8$754,038
Condo Apartment204$695,533

No sales recorded in August 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district C01, published 2026-09-03.

Committee of Adjustment

hearings coming up

None scheduled

Updated daily · as of 11 October 2026

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-11.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

13

August 2026

TapClick here to see what the 13 permits were for
  • 1 Blue Jays Way

    • Temporary installation of a G2 concert stage, including trusses, rigging, and associated event support structures within Rogers Centre for the Zach Bryan concert. All temporary structures will be dismantled and removed following the event, with no permanent alterations to the existing building. Build date: Sept 17, 2026; Dismantle date: Sept 20, 2026 · Issued (Permit Issued)
    • Temporary installation of concert stage, truss, rigging and related event structures. Structural review of the stage engineer, ground pressures and existing floor to verify capacity for temporary event loads. All temporary structures will be removed following the event, with no permanent modifications to the building. Build date: August 17, 2026; Dismantle date: August 24, 2026 · Issued (Permit Issued)
    • Installation and removal of temporary stage, platforms, ramps and associated event structures for the concert at Rogers Center · Issued (Permit Issued)
  • 115 Fort York Blvd

    • Plumbing - Proposal for interior alterations to revise layout of an existing exercise studio · Issued (Permit Issued)
    • HVAC - Proposal for interior alterations to revise layout of an existing exercise studio · Issued (Permit Issued)
    • Proposal for interior alterations to revise layout of an existing exercise studio · Issued (Permit Issued)
  • 500 Lake Shore Blvd W

    • Proposal for interior alterations for new Post Office and Mail Room - Shoppers Drug Mart · Issued (Permit Issued)
    • Interior renovation of existing LCBO store: check out area and merchandising fixture.Convenience address is 95 Housey St · Work under way (Inspection)
  • 80 Queens Wharf Rd

    • Proposal for water damage restoration · Issued (Permit Issued)
  • 23 Spadina Ave

    • 1 WALL SIGN**CONCORD CANADA HOUSE** · Issued (Permit Issued)

Total over the last 12 months

Harbourfront–CityPlace
153
Average Toronto neighbourhood this size
about 455

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

0

June 2026 – August 2026

Total over the last 12 months

Harbourfront–CityPlace
0
Average Toronto neighbourhood this size
about 5
TapClick here to see the 10 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 12 May 2025 · Site Plan Approval · Under Review

    325 Front St W, 315 Front St W

    Site Plan Approval Application for Phase 1 of a three phase development at 315-325 Front Street West. The Phase 1 site plan includes two primarily residential towers (50 storeys), containing 74,000 square metres of residentail floor area and 830 square metres of retail floor area. A total of 905 residential units are proposed including 32 affordable rental housing units, A childcare centre is also proposed.

    Application 25 158283 STE 10 SA

    On the City’s site →

  • 18 October 2024 · Site Plan Approval · Under Review

    10 Lower Spadina Ave

    Site Plan Application for a 49-storey mixed use building (not including mechanical penthouse), containing approximately 128 square metres of non-residential floor area at grade, and 511 apartment dwelling units.The proposed development has a gross floor area of approximately 32,363.6 square metres and a floor space index of approximately 20.46 times the lot area.

    Application 24 228193 STE 10 SA

    On the City’s site →

  • 18 October 2024 · OPA / Rezoning · Under Review

    10 Lower Spadina Ave

    Zoning By-law Amendment application for a 49-storey mixed use building (not including mechanical penthouse), containing approximately 128 square metres of non-residential floor area at grade, and 511 apartment dwelling units.The proposed development has a gross floor area of approximately 32,363.6 square metres and a floor space index of approximately 20.46 times the lot area.

    Application 24 228228 STE 10 OZ

    On the City’s site →

  • 3 May 2022 · OPA / Rezoning · Under Review

    595 Front St W

    Official Plan and Zoning By-law Amendment application to permit development above the Union Station rail corridor between Blue Jays Way and Bathurst Street. The revised proposal includes 9 mixed-use towers ranging in height from 36 to 72-storeys, a new City park and publicly accessible open spaces. The proposed gross floor area (GFA) equals approximately 531,130 m2 of which 494,133 m2 would be residential GFA, comprised of 7,986 residential units and 37,000 m2 would be non-residential GFA, including retail, office, hotel and childcare uses.

    Application 22 141536 STE 10 OZ

    On the City’s site →

  • 3 November 2021 · Condominium Approval · Under Review

    200 Queens Quay W

    *** Draft Plan of Condominium for 1482 units.

    Application 21 233472 STE 10 CD

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C01, which may cover a wider area than Harbourfront–CityPlace alone.

The September 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports