The Keelson · Guildwood

September 2026 edition

Property Snapshot

What is being built, applied for, and sold in Guildwood.

Home prices

average sale price

$775,635

August 2026 · 37 sales

$700K$800K$900K$1.0MAug 25Nov 25Feb 26May 26Aug 26

12-month average: $844,687.

Based on 37 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, August 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, August 2026
Home typeSalesAverage price
Detached15$1,193,200
Semi-Detached1—
Att/Row/Townhouse1—
Condo Townhouse3$515,000
Condo Apartment17$452,676

Semi-Detached: 1 sale; Att/Row/Townhouse: 1 sale, too few to average.

No sales recorded in August 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district E08, published 2026-09-03.

Committee of Adjustment

hearings coming up

None scheduled

Updated daily · as of 11 October 2026

Decided in August 2026

1 — all approved

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-11.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

16

August 2026

TapClick here to see what the 16 permits were for
  • 29 Bledlow Manor Dr

    • Proposal to construct carport. · Issued (Permit Issued)
  • 31 Fintona Ave

    • Proposal for interior alterations to remove walls on the main floor and install a new wood beam. · Closed (Closed)
  • 102 Greyabbey Trl

    • Proposed interior alterations to washroom on main-floor single family dwelling. · Issued (Permit Issued)
    • Plumbing - Proposed interior alterations to washroom on main-floor single family dwelling. · Work under way (Inspection)
  • 15 Lausanne Cres

    • Proposal to construct a new rear shed. · Work under way (Inspection)
  • 25 Lausanne Cres

    • Plumbing - CONVERT EXISTING SFD TO A MULTI-TENANT HOUSE (BASEMENT TO CONTAIN 6 ROOMS). MAIN FLOOR TO REMAIN AS IS · Issued (Permit Issued)
    • CONVERT EXISTING SFD TO A MULTI-TENANT HOUSE (BASEMENT TO CONTAIN 4 ROOMS). MAIN FLOOR TO REMAIN AS A SEPARATE SINGLE DWELLIGN UNIT · Issued (Permit Issued)
    • HVAC - CONVERT EXISTING SFD TO A MULTI-TENANT HOUSE (BASEMENT TO CONTAIN 6 ROOMS). MAIN FLOOR TO REMAIN AS IS · Issued (Permit Issued)

Total over the last 12 months

Guildwood
104
Average Toronto neighbourhood this size
about 108

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

0

June 2026 – August 2026

Total over the last 12 months

Guildwood
1
Average Toronto neighbourhood this size
about 1
TapClick here to see the 2 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 12 March 2025 · Site Plan Approval · Under Review

    66 Dearham Wood

    The proposed development consists of a 4,208 m2 institutional building which will be a newreplacement school and child care facility for the existing facility on the same property.

    Application 25 128145 ESC 24 SA

    On the City’s site →

  • 30 November 2015 · Site Plan Approval · Under Review

    130 Westlake Rd

    Replace and expand the existing Guildwood GO station buildings, replace the existing tunnel under the tracks with a new and larger tunnel, provide for additional bicycle parking, expand 'kiss 'n ride' facilities, improve passenger pick-up areas, add new canopies on the waiting platforms, and construct a utility building on the site.

    Application 15 258489 ESC 43 SA

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district E08, which may cover a wider area than Guildwood alone.

The September 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports