Property Snapshot

What is being built, applied for, and sold in Etobicoke City Centre.

Home prices

average sale price

$1,186,441

September 2026 · 110 sales

$1.0M$1.2M$1.4MSep 25Dec 25Mar 26Jun 26Sep 26

12-month average: $1,187,323.

Based on 110 sales in September 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, September 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, September 2026
Home typeSalesAverage price
Detached49$1,901,530
Semi-Detached1—
Att/Row/Townhouse1—
Condo Townhouse1—
Condo Apartment58$589,062

Semi-Detached: 1 sale; Att/Row/Townhouse: 1 sale; Condo Townhouse: 1 sale, too few to average.

No sales recorded in September 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district W08, published 2026-10-06.

Committee of Adjustment

hearings coming up

None scheduled

Updated daily · as of 22 November 2026

Decided in September 2026

3 — all approved

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-11-22.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

31

September 2026

TapClick here to see what the 31 permits were for
  • 211 Bering Ave

    • NEW CONSTRUCTION GARDEN SUITE (Unit # GS) · Issued (Permit Issued)
    • Plumbing - NEW CONSTRUCTION GARDEN SUITE (Unit # GS) · Issued (Permit Issued)
    • Drain - NEW CONSTRUCTION GARDEN SUITE (Unit # GS) · Issued (Permit Issued)
    • Drain - NEW CONSTRUCTION GARDEN SUITE (Unit # GS) · Issued (Permit Issued)
    • NEW CONSTRUCTION GARDEN SUITE (Unit # GS) · Issued (Permit Issued)
    • HVAC - NEW CONSTRUCTION GARDEN SUITE (Unit # GS) · Issued (Permit Issued)
    • NEW CONSTRUCTION GARDEN SUITE (Unit # GS) · Issued (Permit Issued)
    • Plumbing - NEW CONSTRUCTION GARDEN SUITE (Unit # GS) · Issued (Permit Issued)
    • Drain - NEW CONSTRUCTION GARDEN SUITE (Unit # GS) · Issued (Permit Issued)
    • Plumbing - NEW CONSTRUCTION GARDEN SUITE (Unit # GS) · Issued (Permit Issued)
    • HVAC - NEW CONSTRUCTION GARDEN SUITE (Unit # GS) · Issued (Permit Issued)
    • HVAC - NEW CONSTRUCTION GARDEN SUITE (Unit # GS) · Issued (Permit Issued)
  • 12 Cordova Ave

    • HVAC - 24-storey residential building located south of the intersection of Dundas Street West and CordovaAvenue with atotal of 325 residential dwelling units and 4 levels of below grade parking and a mix of indoor andoutdoor amenities. · Issued (Permit Issued)
  • 8 Crown Crt

    • Proposal for the demolition of the existing accessory building and replacement of the area with soft landscaping · Closed (Closed)
  • 5137 Dundas St W

    • Proposed sprinkler design drawings including hydraulic calculations for interior alteration for daycare tenant fit-up at ground floor. Related to permit # 26-168200 BLD 00 BA · Issued (Permit Issued)
  • 25 Mabelle Ave

    • Proposal for Garage Repairs including stairwells and playground construction · Issued (Permit Issued)

Total over the last 12 months

Etobicoke City Centre
329
Average Toronto neighbourhood this size
about 326

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

2

July 2026 – September 2026

Total over the last 12 months

Etobicoke City Centre
8
Average Toronto neighbourhood this size
about 4
TapClick here to see the 26 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 17 September 2026 · Site Plan Approval · Under Review

    5207 Dundas St W

    Site Plan Administrative application in relation to file #22 212809 WET 03 SA.

    Application 26 239264 WET 03 SA

  • 27 August 2026 · OPA / Rezoning · Under Review

    970 Kipling Ave

    An application to amend the Zoning By-law to Lift the "(H)" Holding Symbol, applied by Zoning By-law 492-2026.

    Application 26 226939 WET 03 OZ

    On the City’s site →

  • 29 June 2026 · OPA / Rezoning · Under Review

    25 The West Mall

    Proposed OPA Application for the removal of Street A.

    Application 26 192956 WET 03 OZ

    On the City’s site →

  • 2 June 2026 · Site Plan Approval · Under Review

    970 Kipling Ave

    Proposed 43-storey tower and a 28-storey tower. The Subject Site will include 839 purpose-built rental apartments comprised of 198 affordable units and 641 market units as well as approximately 13,560 SF of retail space.

    Application 26 175993 WET 03 SA

    On the City’s site →

  • 7 May 2026 · Site Plan Approval · Under Review

    1230 The Queensway

    The proposed redevelopment includes a 13-storey mixed-use building containing 175 purpose-built residential rental units with ground floor retail. The development proposes a total gross floor area of 13,341 square metres, consisting of 225 square metres of commercial retail area and 13,115 square metres of residential are

    Application 26 156627 WET 03 SA

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district W08, which may cover a wider area than Etobicoke City Centre alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports