Property Snapshot

What is being built, applied for, and sold in Eringate–Centennial–West Deane.

Home prices

average sale price

$1,186,441

September 2026 · 110 sales

$1.0M$1.2M$1.4MSep 25Dec 25Mar 26Jun 26Sep 26

12-month average: $1,187,323.

Based on 110 sales in September 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, September 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, September 2026
Home typeSalesAverage price
Detached49$1,901,530
Semi-Detached1—
Att/Row/Townhouse1—
Condo Townhouse1—
Condo Apartment58$589,062

Semi-Detached: 1 sale; Att/Row/Townhouse: 1 sale; Condo Townhouse: 1 sale, too few to average.

No sales recorded in September 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district W08, published 2026-10-06.

Committee of Adjustment

hearings coming up

1

Updated daily · as of 22 November 2026

TapClick here to see the 1 hearings coming up

Every hearing scheduled as of 22 November 2026, in the order it will be heard. Descriptions are the City’s own words.

Thursday 3 December

9:30 a.m. · Virtual Hearing / Council Chamber, Etobicoke Civic Centre, 399 The West Mall, M9C 2Y2

  • 1 West Deane Valley Rd

    To legalize and to maintain the existing north side yard enclosed deck.

    File A0317/26EYK

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-11-22.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

5

September 2026

TapClick here to see what the 5 permits were for
  • 256 Centennial Park Rd

    • Proposal to demolish one washroom building at park locationRefer to 26 218290 BA - to install two (2) prefabricated washroom buildings each containing 2 separate · Issued (Permit Issued)
  • 56 Deanewood Cres

    • Proposal to install backwater valve. · Closed (Closed)
  • 69 Hardwick Crt

    • Proposal to construct a new enclosed Garage attached on the side of the existing dwelling · Work under way (Inspection)
  • 3 Oxenden Cres

    • Proposal to install a fire sprinkler system. · Issued (Permit Issued)
    • HVAC - Proposed new one storey garden suite in the rear yard · Issued (Permit Issued)

Total over the last 12 months

Eringate–Centennial–West Deane
145
Average Toronto neighbourhood this size
about 187

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

3

July 2026 – September 2026

Total over the last 12 months

Eringate–Centennial–West Deane
3
Average Toronto neighbourhood this size
about 2
TapClick here to see the 7 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 28 August 2025 · Site Plan Approval · Under Review

    5495 Eglinton Ave W

    Site Plan Application proposes to redevelop the site including the construction of a new convenience store/quick-service restaurant with an associated drive-through facility, a patio area, and improved landscaping throughout the property. The existing Gas Canopy is to remain.

    Application 25 217373 WET 02 SA

    On the City’s site →

  • 8 November 2022 · Site Plan Approval · Under Review

    630 The East Mall

    Proposed development of one residential building containing two 24-storey towers connected by a 9-storey podium, and one 12-storey building fronting The East Mall. A total of 839 units are proposed.

    Application 22 227327 WET 02 SA

    On the City’s site →

  • 23 September 2022 · OPA / Rezoning · OMB Appeal

    630 The East Mall

    This application proposes to amend the Zoning By-law to permit the development of one residential building containing two 24-storey towers connected by a 9-storey podium, and one 12-storey building fronting The East Mall. A total of 839 units are proposed.

    Application 22 207881 WET 02 OZ

    On the City’s site →

  • 29 April 2022 · Site Plan Approval · Under Review

    620 The East Mall, 600 The East Mall

    Proposed development consisting of an 11-storey mixed-use mid-rise building fronting The East Mall and two new 24-storey residential towers atop a 3 and 8 storey podium. A total of 757 residential units are proposed, with 685 vehicular parking spaces and 580 bicycle parking spaces provided on 2 levels of below-grade parking and 2 levels of above-grade parking. The proposal has a residential Gross Floor Area of 54,723 square metres and a Floor Space Index of 2.4.

    Application 22 139929 WET 02 SA

    On the City’s site →

  • 28 July 2020 · Site Plan Approval · Under Review

    900 The East Mall

    Site Plan Control application to permit a phased mixed-use development consisting of 4 buildings ranging from 20 to 21 storeys that will include 858 residential units, non-residential uses (retail, daycare and office space), and a public park that will adjoin a POPS on the southeast portion of the site. The proposed total gross floor area is 82,392 m², of which 75,398 m² would be residential and 6,994 m² would be comprised of non-residential uses (5,824 m² office, 183 m² daycare and 987 m² of retail). (Related Official Plan and Zoning By-law Amendement Application File No. 19 236352 WET 02 OZ).

    Application 20 173796 WET 02 SA

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district W08, which may cover a wider area than Eringate–Centennial–West Deane alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports