September 2026 edition
Property Snapshot
What is being built, applied for, and sold in Dufferin Grove.
Home prices
average sale price
$778,870
August 2026 · 231 sales
12-month average: $815,975.
| Month | Average sale price |
|---|---|
| Aug 2025 | $813,335 |
| Sep 2025 | $853,493 |
| Oct 2025 | $846,197 |
| Nov 2025 | $796,345 |
| Dec 2025 | $778,532 |
| Jan 2026 | $757,256 |
| Feb 2026 | $846,628 |
| Mar 2026 | $811,594 |
| Apr 2026 | $818,716 |
| May 2026 | $831,586 |
| Jun 2026 | $852,972 |
| Jul 2026 | $773,284 |
| Aug 2026 | $778,870 |
Based on 231 sales in August 2026.
TapClick to see what your type of home is selling forHide the home types
Sales and average price by major home type, August 2026 — the latest Market Watch issue that carries this breakdown.
| Home type | Sales | Average price |
|---|---|---|
| Detached | 3 | $2,373,000 |
| Semi-Detached | 12 | $1,519,667 |
| Att/Row/Townhouse | 4 | $1,660,750 |
| Condo Townhouse | 8 | $754,038 |
| Condo Apartment | 204 | $695,533 |
No sales recorded in August 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.
Toronto region: average sale price by year since 2013
| Month | Average sale price |
|---|---|
| 2013 | $525,681 |
| 2014 | $569,402 |
| 2015 | $623,529 |
| 2016 | $731,927 |
| 2017 | $823,422 |
| 2018 | $784,118 |
| 2019 | $812,989 |
| 2020 | $926,340 |
| 2021 | $1,098,088 |
| 2022 | $1,193,766 |
| 2023 | $1,131,219 |
| 2024 | $1,120,241 |
TRREB Market Watch, historic annual statistics.
TRREB Market Watch, district C01, published 2026-09-03.
Committee of Adjustment
hearings coming up
None scheduled
Updated daily · as of 11 October 2026
Decided in August 2026
1 — all approved
City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-11.
Get next month’s edition
No app, no download, no password. Just one email, once a month.
Building permits
permits issued this month
24
August 2026
TapClick here to see what the 24 permits were forHide the 24 permits
18 Chesley Ave
- Drain - Proposed Laneway House at backyard · Issued (Permit Issued)
- Proposed Laneway House at backyard · Work under way (Inspection)
90 Croatia St
- Maglocks Testing and Verifications prior to 1st Occupancy · Work under way (Inspection)
980 Dufferin St
- Plumbing - Proposal to renovate an vacant leasable space to a new childcare facility · Issued (Permit Issued)
- HVAC - Proposal to renovate an vacant leasable space to a new childcare facility · Issued (Permit Issued)
- Proposal to renovate an vacant leasable space to a new childcare facility · Issued (Permit Issued)
465 Gladstone Ave
- HVAC - PROPOSED 2ND UNIT AND REAR 2ND FLOOR ENTRANCE · Issued (Permit Issued)
5 Lindsey Ave
- HVAC - Interior alterations · Work under way (Inspection)
Total over the last 12 months
- Dufferin Grove
- 273
- Average Toronto neighbourhood this size
- about 145
City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.
Development applications
applications this quarter
1
June 2026 – August 2026
Total over the last 12 months
- Dufferin Grove
- 6
- Average Toronto neighbourhood this size
- about 2
TapClick here to see the 15 open applications Hide the 15 open applications
Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.
27 February 2026 · Site Plan Approval · Under Review
90 Croatia St, 1141 Bloor St W
Site Plan Administrative Amendment to 22 129524 STE 09 SA.
Application 26 122265 STE 09 SA
27 February 2026 · Site Plan Approval · Under Review
90 Croatia St, 1141 Bloor St W
Site Plan Administrative Amendment to 22 129491 STE 09 SA.
Application 26 122305 STE 09 SA
30 May 2024 · Site Plan Approval · Under Review
158 Sterling Rd
Site Plan Approval for a 31-storey mixed-use building which includes 25,493m2 of residential gross floor area with 388 residential units and 838m2 of non-residential GFA. A two-storey commercial building including 1,030m2 of non-residential will be connected below grade consists of a 2-level parking garage.
Application 24 156482 STE 09 SA
15 August 2022 · Site Plan Approval · Under Review
158 Sterling Rd
Site Plan application to allow for the construction of a new commercial office building. The proposed building will be 11 storeys (44.86 metres) in height, excluding the mechanical penthouse. The proposed gross floor area of the building is 16,736.56 square metres, consisting of 16,544.91 square metres of office space and 191.65 square metres of ground floor retail uses.
Application 22 191025 STE 09 SA
9 August 2022 · Site Plan Approval · Under Review
1293 Bloor St W
The Site is proposed to be redeveloped with a new 28-storey (plus mechanical penthouse) mixed-use building. A total gross floor area of 18,392 square metres is proposed, consisting of 18,145 square metres of residential uses and 247 square metres of grade-related retail uses.
Application 22 188061 STE 09 SA
City of Toronto Open Data — Development Applications, as of 2026-10-11.
Know a neighbour who’d want this?
It’s free, and there’s a new one every month.
How to read this
Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.
An application is a request, not an approval. Sale prices cover TRREB district C01, which may cover a wider area than Dufferin Grove alone.
The September 2026 safety report covers what was reported to police. Each figure names the period it covers.
Looking for another neighbourhood?
Nothing is sent anywhere — this check runs in your browser.