The Keelson · Bayview Village

September 2026 edition

Property Snapshot

What is being built, applied for, and sold in Bayview Village.

Home prices

average sale price

$906,508

August 2026 · 102 sales

$700K$800K$900K$1.0MAug 25Nov 25Feb 26May 26Aug 26

12-month average: $884,841.

Based on 102 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, August 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, August 2026
Home typeSalesAverage price
Detached26$1,565,140
Semi-Detached10$922,600
Condo Townhouse14$738,843
Condo Apartment52$619,237

No sales recorded in August 2026: Att/Row/Townhouse, Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district C15, published 2026-09-03.

Committee of Adjustment

hearings coming up

1

Updated daily · as of 11 October 2026

Decided in August 2026

1 — all approved with conditions

TapClick here to see the 1 hearings coming up

Every hearing scheduled as of 11 October 2026, in the order it will be heard. Descriptions are the City’s own words.

Thursday 15 October

2:00 p.m. · Virtual Hearing / Members' Lounge, Lower Level, North York Civic Centre, 5100 Yonge Street, M2N 5V7

  • 15 Restwell Cres

    To construct a new two (2) storey dwelling

    File A0309/26NY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-11.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

8

August 2026

TapClick here to see what the 8 permits were for
  • 12 Earlywood Crt

    • A proposed sunroom at the southeast corner of the building, in the location of the existing wood deck. · Issued (Permit Issued)
  • 43 Forest Grove Dr

    • HVAC - Proposal for interior alterations including replace the electric stove with gas stove and new exhaust hood and supression system in an existing place of worship - "Lingyen Mountain Temple" · Work under way (Inspection)
  • 18 Heathview Ave

    • Proposal for Installation of solar panel on roof top · Issued (Permit Issued)
  • 625 Sheppard Ave E

    • HVAC - Proposed interior alterations to convert vacant unit to a yoga studio. · Work under way (Inspection)
    • Plumbing - Proposed interior alterations to convert vacant unit to a yoga studio. · Work under way (Inspection)
  • 685 Sheppard Ave E

    • HVAC - Renovation of existing basement, east side to be converted into office suites. · Issued (Permit Issued)
    • Plumbing - Renovation of existing basement, east side to be converted into office suites. · Issued (Permit Issued)
    • Renovation of existing basement, east side to be converted into office suites. · Work under way (Inspection)

Total over the last 12 months

Bayview Village
168
Average Toronto neighbourhood this size
about 288

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

1

June 2026 – August 2026

Total over the last 12 months

Bayview Village
6
Average Toronto neighbourhood this size
about 3
TapClick here to see the 22 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 16 June 2026 · OPA / Rezoning · Under Review

    3059 Bayview Ave, 3061 Bayview Ave, 3063 Bayview Ave and 4 more addresses

    Rezoning Application proposes the development of a 6-storey residential building. The building will provide a total of 155 residential units, being a mix of 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Burleigh Heights Drive will be provided, leading to 1 level of below grade parking, providing a total of 115 parking spaces; as well as 133 bicycle parking spaces. The proposed development provides a total GFA of 12,334.40 square metres and a FSI of 3.12. Additionally, the proposed development provides 327 square metres of indoor amenity space and 310 square metres of outdoor amenity space.

    Application 26 185171 NNY 17 OZ

    On the City’s site →

  • 7 May 2026 · OPA / Rezoning · Under Review

    688 Sheppard Ave E, 680 Sheppard Ave E

    OPA & Rezoning Application proposes the development of two towers at 37 and 28 storeys on a shared six-storey podium with a total of 789 residential units, inclusive of 47 rental replacement units. A total of approximately 70 square metres of retail space is proposed. An on-site parkland dedication is proposed with an area of 759 square metres and a walkway proposed as a POPS with an area of 1,000 square metres. The building will be a phased development with the 28 storey tower proposed as Phase I and the 37 storey tower as Phase II.

    Application 26 156705 NNY 17 OZ

    On the City’s site →

  • 6 January 2026 · OPA / Rezoning · OMB Appeal

    41 Talara Dr, 43 Talara Dr, 45 Talara Dr and 1 more address

    OPA & Rezoning Application proposes the development of a 43-storey residential building. The building will provide a total of 369 residential units, being a mix of studio, 1-bedroom, 2-bedroom, and 3-bedroom units. A paved access from Talara Dr along the west property line will be provided, leading to 2 levels of below-grade parking, providing a total of 37 parking spaces; as well as 150 bicycle parking spaces. The proposed development provides a total GFA of 30,285.00 square metres and a FSI of 14.75. Additionally, the proposed development provides 862.90 square metres of indoor amenity space and 613.11 square metres of outdoor amenity space.

    Application 26 101193 NNY 17 OZ

    On the City’s site →

  • 11 December 2025 · OPA / Rezoning · Under Review

    2901 Bayview Ave, 630 Sheppard Ave E

    The City of Toronto¿s Development Review Division has received an application to permit additional heights to a 52 and 44-storey mixed-use building from a Tribunal-approved 30 and 29-storey mixed-use building. The total gross floor area is 93,208 square metres (77,341 square metres and 4,667 square metres) for the ¿South-West Parcel¿ within the Bayview Village Shopping Mall at 630-Shepard Avenue East and 2901 Bayview Avenue. Note, a paved access along the north property line will be provided, leading to 3 levels of below-grade parking,

    Application 25 265324 NNY 17 OZ

  • 10 July 2025 · OPA / Rezoning · Under Review

    635 Sheppard Ave E, 1 Greenbriar Rd

    Official Plan Amendment and Zoning By-law Amendment application to permit a 30-storey building with residential and commercial uses. The building proposes 351 residential units. Vehicle access is from Greenbriar Road, leading to a three level parking garage, containing 97 parking spaces, including 5 parking spaces shared between visitors and the commercial uses. A total of 274 bicycle parking spaces are proposed including 239 long term and 35 short term spaces. The proposed development provides a total GFA of 22,416.70 square metres and a FSI of 11.23. Additionally, the proposed development provides 637.90 square metres of indoor amenity space and 632.40 square metres of outdoor amenity space.

    Application 25 191848 NNY 17 OZ

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C15, which may cover a wider area than Bayview Village alone.

The September 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports