Property Snapshot

What is being built, applied for, and sold in Bay–Cloverhill.

Home prices

The average across all homes sold in the district — not the price of any individual home.

average sale price

$778,870

August 2026 · 231 sales

$750K$800K$850K$900KAug 25Nov 25Feb 26May 26Aug 26

12-month average: $815,975.

Based on 231 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, July 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, July 2026
Home typeSalesAverage price
Detached6$1,519,333
Semi-Detached18$1,341,278
Att/Row/Townhouse11$1,195,573
Condo Townhouse13$1,006,383
Condo Apartment229$675,574

No sales recorded in July 2026: Link, Co-Op Apartment, Detached Condo, Co-Ownership Apartment.

January – August 2026, across 2,055 sales
$812,243

TRREB Market Watch, district C01, published 2026-09-03. Updated when TRREB publishes the next Market Watch.

Average sale price by year

TRREB’s own average sale price by year, across the whole Toronto Regional Real Estate Board area — every district combined, not this neighbourhood alone.

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

Committee of Adjustment

Requests to build slightly outside the zoning rules, or to divide a lot. Each gets a public hearing.

hearings coming up

2

Updated daily · as of 6 October 2026

TapClick here to see the 2 hearings coming up

Every hearing scheduled as of 6 October 2026, in the order it will be heard. Descriptions are the City’s own words.

Wednesday 14 October

Delegated Consent · Delegated Consent

  • 2 St Thomas St

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.

    File B0002/26TEY

TBD · TBD

  • 6 St Thomas St

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.

    File B0041/26TEY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-10-06.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

Permission to start work that already meets the rules. Most are small: a deck, a furnace, or a basement.

permits issued this month

20

September 2026

Total over the last 12 months

Bay–Cloverhill
183
Average Toronto neighbourhood this size
about 289
TapClick here to see what the 20 permits were for

Every permit issued in September 2026, grouped by address. One property often has several — a new building carries its own plumbing, drain and mechanical permits. Descriptions are the City’s own words, and the status is where each permit stands now, not when it was issued — so work that has since finished reads “Closed”, and the stages are explained on the About the data page.

  • 800 Bay St

    • Proposal to supply and install backflow preventor one new 3" DCVA BFP to replace existing faulty 3" DCVA BFP. · Issued (Permit Issued)
  • 801 Bay St

    • Application for a permit to erect and display one first party wall sign, displaying static copy and illuminated, erected at the first storey. Dimensions:Wall sign: 0.61m L x 3.658m W x 0.01m D at a height of 3.66 on the south elevation.** INFINITY VAPE** · Issued (Permit Issued)
  • 900 Bay St

    • Proposal for maglock installation: six maglocks for Levels 3-8 and six maglocks for Levels 9-15 (Ferguson Tower) · Issued (Permit Issued)
  • 55 Bloor St W

    • 1 wall sign.***SPIER & MACKAY*** · Issued (Permit Issued)
  • 77 Bloor St W

    • Proposed waterproofing and concrete repairs · Issued (Permit Issued)

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-06.

Apply for a building permit

Development applications

A request to build something the current rules don’t allow — a rezoning, or a variance.

applications in the latest quarter on record

2

June 2026 – August 2026

Total over the last 12 months

Bay–Cloverhill
4
Average Toronto neighbourhood this size
about 3
TapClick here to see the 26 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 22 July 2026 · Site Plan Approval · Under Review

    8 Cumberland St, 834 Yonge St, 832 Yonge St and 8 more addresses

    Application 26 206628 STE 11 SA

  • 30 January 2026 · Condominium Approval · Under Review

    27-29 Yorkville Ave

    Draft Plan of Condominium Application for North Tower B with 760 residential units proposed.

    Application 26 110980 STE 11 CD

    On the City’s site →

  • 30 January 2026 · Condominium Approval · Under Review

    27-29 Yorkville Ave

    An application for Draft Plan of Condominium. The application proposes to create 378 residential units.

    Application 26 110985 STE 11 CD

    On the City’s site →

  • 12 June 2025 · Site Plan Approval · Under Review

    555 Yonge St, 543 Yonge St

    Site Plan Approval for a 68 storey mixed-use building. There will be 679 dwelling unit and 45,139 square meters of GFA, including 455 square meters of retail at grade.

    Application 25 176290 STE 13 SA

    On the City’s site →

  • 8 November 2024 · Site Plan Approval · Under Review

    145 St Luke Lane, 530 Yonge St, 550 Yonge St and 8 more addresses

    Site Plan application for a proposed 67-storey residential/mixed-use building comprised of approximately 52,086 square metres of gross floor area (GFA), comprised of 51,075 square metres of residential GFA, 543 square metres of grade-related retail space and 469 square metres of community cultural space.Approximately 860 residential units are proposed with parking and loading access from St. Luke Lane.

    Application 24 237031 STE 13 SA

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-06. Refreshes automatically when the source publishes.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C01, which may cover a wider area than Bay–Cloverhill alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports