The Keelson · Annex

October 2026 edition

Property Snapshot

What is being built, applied for, and sold in Annex.

Home prices

average sale price

$1,773,011

September 2026 · 58 sales

$1.0M$1.5M$2.0M$2.5MSep 25Dec 25Mar 26Jun 26Sep 26

12-month average: $1,736,605.

Based on 58 sales in September 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, September 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, September 2026
Home typeSalesAverage price
Detached8$2,280,688
Semi-Detached10$1,853,000
Att/Row/Townhouse6$2,007,833
Condo Townhouse2—
Condo Apartment30$1,690,737
Co-Ownership Apartment2—

Condo Townhouse: 2 sales; Co-Ownership Apartment: 2 sales, too few to average.

No sales recorded in September 2026: Link, Co-Op Apartment, Detached Condo.

Toronto region: average sale price by year since 2013

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

TRREB Market Watch, district C02, published 2026-10-06.

Committee of Adjustment

hearings coming up

4

Updated daily · as of 22 November 2026

Decided in September 2026

5 — 4 approved, 1 refused

TapClick here to see the 4 hearings coming up

Every hearing scheduled as of 22 November 2026, in the order it will be heard. Descriptions are the City’s own words.

Wednesday 25 November

9:30 a.m. · Virtual Hearing / Committee Room 2, Second Floor, Toronto City Hall, 100 Queen Street W, M5H 2N2

  • 250 Davenport Rd

    To alter the existing parking configuration of the existing 25-storey apartment building containing 460 dwelling units, a three-level underground parking garage and two surface parking spaces by decreasing the existing number of visitor parking spaces and increasing the existing number of accessible parking spaces and the number of resident parking spaces. There will be a total of 102 parking spaces (75 tenant parking spaces, 13 accessible tenant parking spaces, 10 staff parking spaces, 2 agency parking spaces, and 2 accessible visitor parking spaces) on this lot.

    File A0644/26TEY

3:00 p.m. · Virtual Hearing / Committee Room 2, Second Floor, Toronto City Hall, 100 Queen Street W, M5H 2N2

  • 439 Clinton St

    To alter the existing three-storey detached dwelling by constructing a front one-storey addition (enclosing the existing covered front porch for use as a mudroom).

    File A0706/26TEY

Wednesday 2 December

2:00 p.m. · Virtual Hearing / Committee Room 2, Second Floor, Toronto City Hall, 100 Queen Street W, M5H 2N2

  • 79 Roxborough St W

    To alter the existing three-storey detached dwelling by constructing a rear addition at the lower basement level (new mudroom, children's playroom, bathroom, and storage area), which will also connect and provide below grade access from the existing rear one-storey ancillary building (one-car garage) to the main dwelling.

    File A0577/26TEY

Wednesday 16 December

9:30 a.m. · Virtual Hearing / Committee Room 2, Second Floor, Toronto City Hall, 100 Queen Street W, M5H 2N2

  • 541 Dupont St

    To construct a new three-storey detached building (houseplex) with front and rear basement walkouts, front and rear ground floor porches with stairs, side (east) yard entrances on the ground floor, and front and rear second and third storey balconies. The second storey will be cantilevered at the east side of the main building. Also, to construct a new rear two-storey detached ancillary building containing one laneway suite with a basement level (storage), and a cantilevered second storey (south) with one surface parking space below, abutting the laneway. There will be a total of seven residential dwelling units on this lot (two units within the basement, two units on the ground floor, and two units occupying the second and third storeys of the main building and one unit within the ancillary building containing a laneway suite).

    File A0749/26TEY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-11-22.

Look up an application, or find out how to participate

Get next month’s edition

No app, no download, no password. Just one email, once a month.

Building permits

permits issued this month

70

September 2026

TapClick here to see what the 70 permits were for
  • 40 Albany Ave

    • Proposal for interior alterations. · Issued (Permit Issued)
    • Drain - Proposal for interior alterations. · Issued (Permit Issued)
    • Plumbing - Proposal for interior alterations. · Issued (Permit Issued)
  • 108 Albany Ave

    • propose to install back water valve · Closed (Closed)
  • 271 Albany Ave

    • Proposal to install backwater valve · Issued (Permit Issued)
  • 38 Avenue Rd

    • Plumbing - Proposed interior alterations to existing residential condominium unit including structural changes to shear wall, non structural changes to partition wall, bathroom and kitchen modifications and finish upgrades. · Issued (Permit Issued)
    • Proposed interior alterations to existing residential condominium unit including structural changes to shear wall, non structural changes to partition wall, bathroom and kitchen modifications and finish upgrades. · Issued (Permit Issued)
    • HVAC - Proposed interior alterations to existing residential condominium unit including structural changes to shear wall, non structural changes to partition wall, bathroom and kitchen modifications and finish upgrades. · Issued (Permit Issued)
  • 2 Bloor St W

    • Proposal for interior demolition of existing Suite 2700. · Issued (Permit Issued)

Total over the last 12 months

Annex
638
Average Toronto neighbourhood this size
about 446

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-10-11.

Apply for a building permit

Development applications

applications this quarter

4

July 2026 – September 2026

Total over the last 12 months

Annex
11
Average Toronto neighbourhood this size
about 5
TapClick here to see the 32 open applications

Every application the City lists as still open in this neighbourhood, newest first — whatever year it was filed. The figures above count applications submitted in the period shown.

  • 23 September 2026 · Site Plan Approval · Under Review

    862 Bathurst St, 864 Bathurst St, 860 Bathurst St

    The proposal involves a 3-storey addition to the existing 2-storey building, resulting in a 5-storey mixed-use building. The development would retain medical office uses in the basement and ground floor, introduce commercial/office space on the second floor, and provide 15 residential units on floors three to five. The proposed building would contain approximately 920 m² of medical office space, 460 m² of commercial/office space, and 1,380 m² of residential space, for a total gross floor area of 2,760 m² (4.72 FSI).

    Application 26 242430 STE 11 SA

    On the City’s site →

  • 26 August 2026 · OPA / Rezoning · Under Review

    210 Bloor St W, 208 Bloor St W

    Proposed redevelopment of the lands with a 36-storey Private Student Residence (112.58 metres in height, including the mechanical penthouse) with 426 dwelling units.27,742 square metres of residential GFA and 220 square metres of non-residential GFA are proposed.4 visitor parking spaces (including 1 accessible space) and 235 bike parking spaces are proposed.

    Application 26 226063 STE 11 OZ

    On the City’s site →

  • 30 January 2026 · Condominium Approval · Under Review

    27-29 Yorkville Ave

    Draft Plan of Condominium Application for North Tower B with 760 residential units proposed.

    Application 26 110980 STE 11 CD

    On the City’s site →

  • 30 January 2026 · Condominium Approval · Under Review

    27-29 Yorkville Ave

    An application for Draft Plan of Condominium. The application proposes to create 378 residential units.

    Application 26 110985 STE 11 CD

    On the City’s site →

  • 2 December 2025 · OPA / Rezoning · OMB Appeal

    173 Lowther Ave, 175 Lowther Ave, 171 Lowther Ave

    Lift the hold ('H') application for By-law 410-2024.

    Application 25 261452 STE 11 OZ

    On the City’s site →

City of Toronto Open Data — Development Applications, as of 2026-10-11.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C02, which may cover a wider area than Annex alone.

The October 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports