The Keelson · Annex

September 2026

Property Snapshot

What is being built, applied for, and sold in Annex.

Home prices

The average across all homes sold in the district — not the price of any individual home.

average sale price

$1,506,649

August 2026 · 39 sales

$1.0M$1.5M$2.0M$2.5MAug 25Nov 25Feb 26May 26Aug 26

12-month average: $1,726,119.

Based on 39 sales in August 2026.

TapClick to see what your type of home is selling for

Sales and average price by major home type, July 2026 — the latest Market Watch issue that carries this breakdown.

Sales and average price by home type, July 2026
Home typeSalesAverage price
Detached8$3,339,687
Semi-Detached10$2,268,000
Att/Row/Townhouse3$1,935,500
Condo Townhouse4$1,406,000
Condo Apartment50$1,377,354
Co-Op Apartment2—

Co-Op Apartment: 2 sales, too few to average.

No sales recorded in July 2026: Link, Detached Condo, Co-Ownership Apartment.

2026 so far, across 476 sales
$1,675,553

TRREB Market Watch, district C02, published 2026-09-03.

Average sale price by year

TRREB’s own average sale price by year, across the whole Toronto Regional Real Estate Board area — every district combined, not this neighbourhood alone.

$500K$1.0M$1.5M20132016201920222024

TRREB Market Watch, historic annual statistics.

Committee of Adjustment

Requests to build slightly outside the zoning rules, or to divide a lot. Each gets a public hearing.

hearings coming up

6

Updated daily · as of 24 September 2026

Decided in August 2026

5 — all approved

TapClick here to see the 6 hearings coming up

Every hearing scheduled as of 24 September 2026, in the order it will be heard. Descriptions are the City’s own words.

Wednesday 7 October

9:30 a.m. · Virtual Hearing / Committee Room 1, Second Floor, Toronto City Hall, 100 Queen St W, M5H 2N2

  • 131 Davenport Rd

    To alter the existing three-storey mixed-use building (previous residential and office uses which are currently vacant) with rear second and third storey balconies, by converting it into a personal service use (grooming spa).

    File A0541/26TEY

Wednesday 14 October

9:30 a.m. · Virtual Hearing / Committee Room 1, Second Floor, Toronto City Hall, 100 Queen St W, M5H 2N2

  • 6 Gibson Ave

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.

    File A0549/26TEY

  • 1235 Bay St

    To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.

    File A0602/26TEY

2:00 p.m. · Virtual Hearing / Committee Room 1, Second Floor, Toronto City Hall, 100 Queen St W, M5H 2N2

  • 11 Barton Ave

    To construct a one-storey detached ancillary building (gym) with a covered porch (located at the northeast corner of the building), in the rear yard.

    File A0632/26TEY

  • 80 Barton Ave

    To permit an existing ground floor eating establishment (coffee shop with indoor seating, and retail store), and an existing ground floor instructional artist studio (including a retail store), to operate within the three-storey mixed-use building. There are two residential dwelling units (occupying the second and third levels).

    File A0640/26TEY

City of Toronto Open Data — Committee of Adjustment Applications, as of 2026-09-24.

Look up an application, or find out how to participate

Get next month’s edition

No apps to download. No password to remember. One email, one click, once a month.

Building permits

Permission to start work that already meets the rules. Most are small: a deck, a furnace, or a basement.

permits issued this month

48

August 2026

Total over the last 12 months

Annex
614
Average Toronto neighbourhood this size
about 449
TapClick here to see what the 48 permits were for

Every permit issued in August 2026, grouped by address. One property often has several — a new building carries its own plumbing, drain and mechanical permits. Descriptions are the City’s own words, and the status is where each permit stands now, not when it was issued — so work that has since finished reads “Closed”, and the stages are explained on the About the data page.

  • 120 Albany Ave

    • Install backwater valve on sanitary line · Closed (Closed)
  • 197 Albany Ave

    • Proposal to remove existing open front porch and build new covered front porch · Work under way (Inspection)
  • 1000 Bathurst St

    • Interior Alterations to add bedrooms to Unit 403. Base building permit: 16-157273 BLD 00 NB · Work under way (Inspection)
  • 1085 Bathurst St

    • Proposed window replacement, back patio fence, and interior alterations to existing mixed use building · Issued (Permit Issued)
  • 1200 Bay St

    • FS - Sprinkler Shop Drawing - Proposed interior alterations to existing retail space, Unit 1. · Closed (Closed)

City of Toronto Open Data — Building Permits (active and cleared), as of 2026-09-08.

Apply for a building permit

Development applications

A request to build something the current rules don’t allow — a rezoning, or a variance.

applications in the latest quarter on record

0

May 2026 – July 2026

Total over the last 12 months

Annex
5
Average Toronto neighbourhood this size
about 5

City of Toronto Open Data — Development Applications, as of 2026-09-08. Refreshes automatically when the source publishes.

Look up an application, or comment on one

Know a neighbour who’d want this?

It’s free, and there’s a new one every month.

How to read this

Applications and permits are separate City processes. Most building permits never involve a development application, and the two counts above are not connected — a permit issued this month is not the outcome of an application made this month.

An application is a request, not an approval. Sale prices cover TRREB district C02, which may cover a wider area than Annex alone.

The September 2026 safety report covers what was reported to police. Each figure names the period it covers.

Looking for another neighbourhood?

Search by

Nothing is sent anywhere — this check runs in your browser.

TapClick here for all reports